Accident investigation delays
Accident investigation delays
Author
Discussion

mybrainhurts

Original Poster:

90,809 posts

286 months

Tuesday 26th November 2013
quotequote all
A couple of trucks came together on the A34 at 04.30 today and the northbound carriageway was closed this afternoon for accident investigation work. The Highways Agency gave an expected reopening time of 18.00.

That's thirteen and a half hours, say eight and a half hours in daylight, in good weather.

Why do they need so much time to do this work?

Nimbus

1,176 posts

259 months

Tuesday 26th November 2013
quotequote all
mybrainhurts said:
A couple of trucks came together on the A34 at 04.30 today and the northbound carriageway was closed this afternoon for accident investigation work. The Highways Agency gave an expected reopening time of 18.00.

That's thirteen and a half hours, say eight and a half hours in daylight, in good weather.

Why do they need so much time to do this work?
It actually re-opened at 15:30ish...

When I went past at 8am, the cab of the lorry that did the crashing looked f****d... I suspect it was a fatal.

There was also looked a fair amount of damage to the carriageway.

I expect they needed the time to figure out how a HGV could run straight into the back of a bright yellow 'works' lorry, with the big flashing yellow lights, and a keep left sign on it...


Rude-boy

22,227 posts

264 months

Tuesday 26th November 2013
quotequote all
Nimbus said:
It actually re-opened at 15:30ish...

When I went past at 8am, the cab of the lorry that did the crashing looked f****d... I suspect it was a fatal.

There was also looked a fair amount of damage to the carriageway.

I expect they needed the time to figure out how a HGV could run straight into the back of a bright yellow 'works' lorry, with the big flashing yellow lights, and a keep left sign on it...
Mobile,
Asleep
Watching a DVD
Looking for something in the back.
Drink
Drugs
Blinded by a low flying zebra

TrafficRat

165 posts

178 months

Tuesday 26th November 2013
quotequote all
Rude-boy said:
Blinded by a low flying zebra
roflroflroflroflroflroflrofl

Happy Shopper

19 posts

167 months

Tuesday 26th November 2013
quotequote all
Rude-boy said:
Blinded by a low flying zebra
I doubt the reasons would have been as black and white as that.

Red Devil

13,534 posts

239 months

Wednesday 27th November 2013
quotequote all
Rude-boy said:
Mobile,
Asleep
Watching a DVD
Looking for something in the back.
Drink
Drugs
Blinded by a low flying zebra
You forgot the folk dance. wink
http://www.youtube.com/watch?v=QIJ4yROg7Ng

V8 Fettler

7,019 posts

163 months

Wednesday 27th November 2013
quotequote all
Nimbus said:
mybrainhurts said:
A couple of trucks came together on the A34 at 04.30 today and the northbound carriageway was closed this afternoon for accident investigation work. The Highways Agency gave an expected reopening time of 18.00.

That's thirteen and a half hours, say eight and a half hours in daylight, in good weather.

Why do they need so much time to do this work?
It actually re-opened at 15:30ish...

When I went past at 8am, the cab of the lorry that did the crashing looked f****d... I suspect it was a fatal.

There was also looked a fair amount of damage to the carriageway.

I expect they needed the time to figure out how a HGV could run straight into the back of a bright yellow 'works' lorry, with the big flashing yellow lights, and a keep left sign on it...
BBC website says ">Five people, including the lorry driver were taken to hospital.<"

mybrainhurts

Original Poster:

90,809 posts

286 months

Wednesday 27th November 2013
quotequote all
Any of our resident plod able to explain why closures can be more than twelve hours? I really would like to know.

Nickyboy

6,826 posts

265 months

Wednesday 27th November 2013
quotequote all
Wasn't fatal and there was no shed load although the load on the truck had "shifted", neither truck had come off the carriageway so i'm at a loss as to why it took 12 hours to clear.


Nigel Worc's

8,121 posts

219 months

Wednesday 27th November 2013
quotequote all
mybrainhurts said:
Any of our resident plod able to explain why closures can be more than twelve hours? I really would like to know.
Because they can seems to be the answer.

It would appear keeping roads open and traffic flowing comes at the bottom of their arse covering list these days, sadly.

FiF

49,056 posts

282 months

Wednesday 27th November 2013
quotequote all
Perhaps just to piss Nigel off.

Nigel Worc's

8,121 posts

219 months

Wednesday 27th November 2013
quotequote all
FiF said:
Perhaps just to piss Nigel off.
I wasn't there, they didn't get me today (unless I get a callout, I've a couple of weeks workshop work) laugh

Gafferjim

1,337 posts

296 months

Thursday 28th November 2013
quotequote all
Any RTC with injuries is always under the control of the Police over-all.
The ambulance personnel will make decisions on how to treat / move the casualty.
The Fire Brigade will work in conjunction with the Ambulance personnel to extract the casualty, make the scene safe.
If it's on a HA road, then the HA will deal with traffic management either with HATO's /ISU's following the instructions of the police.
If the Ambo personnel say that the injuries are "life changing" then the police will need to carry out full Accident Investigation.

Also certain types of RTC, life changing or not, automatically require Accident Investigation, ie. Cross-overs, PSV's.(but don't usually take as long)
The police that are specially trained for AI are normal Traffic Police, who can be out and about doing their normal day job anywhere in the county, they will need to return to their station and get the specialist gear they need to carry out the AI, be briefed and deploy to the accident scene to carry out the job.
If however the serious RTC is during the small hours, the AI team would normally be at home in bed, they need to be contacted, attend their police station, be briefed, collect their gear & attend the scene before being able to start with the investigation.
Also the lack of daylight doesn't help extending the time required so as not to miss anything, emergency lighting may also need to be brought in.
Once the investigation is completed, and don't forget they only have one chance to gather all the information, then recovery of the vehicles and load can go ahead, the vehicles may need to be recovered specially for further investigation.
Once the vehicles are removed, the clean up of the scene will then be done, this may include a specialist company to attend to clear away any bodily fluids, chemicals, oil / fuel spills etc.
If a long length of central reservation barrier has been flattened, that may need immediate attention, this sometimes can be done whilst other things are going on, or maybe there will have to be an outside lane closed for the day and it repaired later the next night.
Meanwhile the HA will have to man the road closure until the police are happy to reopen the road.
It can be very frustrating that road remains closed, but each step of the procedure does take time and has to be done correctly in this "sue anyone" culture.

PS, I don't know about the job in question though.

Edited by Gafferjim on Thursday 28th November 09:54

mybrainhurts

Original Poster:

90,809 posts

286 months

Thursday 28th November 2013
quotequote all
Thanks for that....smile

So it's down to (a)damage repairs, (b)back covering and (c)getting plod out of bed, then?

I can understand carriageway and other repairs, but something needs to be done about (b) and (c), pretty damn' quickly.

Billyray911

1,086 posts

235 months

Thursday 28th November 2013
quotequote all
C isn't relevant in the West Midlands.

anonymous-user

85 months

Thursday 28th November 2013
quotequote all
mybrainhurts said:
Thanks for that....smile

So it's down to (a)damage repairs, (b)back covering and (c)getting plod out of bed, then?

I can understand carriageway and other repairs, but something needs to be done about (b) and (c), pretty damn' quickly.
How much tax do you want to pay?
Chatting to one of the motorway BIB years ago some cover fairly big patches anything up to 40-50 miles just to get to the area at speed so that can be up to 30 mins even shifting it then looking for it if nightime or on large intersections,
BIB don't have a car sat on every junction all night just in case usually 1 or 2 a county.

Oh and they don't have some kind of Star trek/Dr Who style transporter to beam them to incidents, waiting a good hr for ambulances is a regular occurrence.

Mk3Spitfire

2,921 posts

159 months

Thursday 28th November 2013
quotequote all
Nigel Worc's said:
mybrainhurts said:
Any of our resident plod able to explain why closures can be more than twelve hours? I really would like to know.
Because they can seems to be the answer.

It would appear keeping roads open and traffic flowing comes at the bottom of their arse covering list these days, sadly.
How about looking at it like this.

Your loved one is involved in a really nasty accident on a busy stretch of road, involving several vehicles.

I would love to see your rants if the police did a quick clear up job, just so you could get home for your dinner on time, and failed to investigate the accident properly, resulting in the person at fault causing the crash and subsequently the injuries being let off Scot free. At the end of the day, rads are not closed "because they can" or for fun, they are closed because a serious collision needs investigating. Sometimes, it takes 12 hours to investigate a crash properly. But this delay means that someone finds out exactly what happened to their wife/husband/family member, and why they died, and that the person responsible is brought to justice.

So next time you decide to moan that you have to take the long way round, spare a thought for what the reasons behind it might be. The attitude of some people being told the road is closed due to a serious or fatal accident has always amazed me.

mybrainhurts

Original Poster:

90,809 posts

286 months

Thursday 28th November 2013
quotequote all
Mk3Spitfire said:
Nigel Worc's said:
mybrainhurts said:
Any of our resident plod able to explain why closures can be more than twelve hours? I really would like to know.
Because they can seems to be the answer.

It would appear keeping roads open and traffic flowing comes at the bottom of their arse covering list these days, sadly.
How about looking at it like this.

Your loved one is involved in a really nasty accident on a busy stretch of road, involving several vehicles.

I would love to see your rants if the police did a quick clear up job, just so you could get home for your dinner on time, and failed to investigate the accident properly, resulting in the person at fault causing the crash and subsequently the injuries being let off Scot free. At the end of the day, rads are not closed "because they can" or for fun, they are closed because a serious collision needs investigating. Sometimes, it takes 12 hours to investigate a crash properly. But this delay means that someone finds out exactly what happened to their wife/husband/family member, and why they died, and that the person responsible is brought to justice.

So next time you decide to moan that you have to take the long way round, spare a thought for what the reasons behind it might be. The attitude of some people being told the road is closed due to a serious or fatal accident has always amazed me.
In a nutshell, then, blame, punishment, revenge and gross investigation inefficiency + necessary time to repair the carriageway..?

Mk3Spitfire

2,921 posts

159 months

Thursday 28th November 2013
quotequote all
mybrainhurts said:
In a nutshell, then, blame, punishment, revenge and gross investigation inefficiency + necessary time to repair the carriageway..?
....not worth the time....

mybrainhurts

Original Poster:

90,809 posts

286 months

Thursday 28th November 2013
quotequote all
Mk3Spitfire said:
mybrainhurts said:
In a nutshell, then, blame, punishment, revenge and gross investigation inefficiency + necessary time to repair the carriageway..?
....not worth the time....
More inefficiency, eh...?