NSL sign not taken down where 50mph limit implemented
Discussion
I've noticed that where the A6 between Preston and Lancaster has been reduced to 50mph on all the stretches that used to be NSL, there's at least one NSL sign that's missed being taken down. How enforceable is the 50mph limit where NSL signs are still showing and is it still an NSL from the point of passing the NSL sign that's still up to the point of reaching the next 50mph sign, even though the council have presumably gone through all the legal procedures of reducing the speed limit?
Gassing Station | Speed, Plod & the Law | Top of Page | What's New | My Stuff


