MOTd and back on the road
Discussion
At last after 8 months of trying to finish it off( in between 4, 3 week trips to China with work) had Geo done in Sheffield and they Motd it as well. Only note was they needed to tighten the new handbrake cable. I must admit its a barsteward to reach when everything is back in ( diff exhausts drive shafts dampers etc).
Drove back home and the difference was superb.
So new shock/springs, refurbed diff, new bushes, new brake pads and discs, evertything was either re powdercoated or gold elctroplated even the drive shafts and prop have been painted white, all new wheel bearings, new top and bottom ball joints, new track rod ends, new steering rack seals.
But most of it I cant even see, I do however now have the a car that doesnt want to kill me at 120 leptons.
Drove back home and the difference was superb.
So new shock/springs, refurbed diff, new bushes, new brake pads and discs, evertything was either re powdercoated or gold elctroplated even the drive shafts and prop have been painted white, all new wheel bearings, new top and bottom ball joints, new track rod ends, new steering rack seals.
But most of it I cant even see, I do however now have the a car that doesnt want to kill me at 120 leptons.
Gassing Station | Chimaera | Top of Page | What's New | My Stuff


