Hey folks,

Looking to finish off a side extension that we had built 12 months ago, but have mothballed while we focussed on other projects. The room is 7 x 4m and is a concrete slab, the builders put a DPM layer underneath the concrete our which is tanked up the side walls.

i have 125mm PIR boards to lay down, my question is do I need another layer of DPM on the concrete floor before I lay the PIR down?

So should it look like this?



or this?


PhilboSE

5,290 posts

242 months

Friday 14th February
quotequote all
It's best practice to lay a DPM between the slab and the PIR as the slab can corrode the aluminium facing of the PIR.

jdwoodbury

Original Poster:

1,363 posts

222 months

Friday 14th February
quotequote all
PhilboSE said:
It's best practice to lay a DPM between the slab and the PIR as the slab can corrode the aluminium facing of the PIR.
Thanks, can that be a lighter weight DPM, like 500g?

PhilboSE

5,290 posts

242 months

Saturday 15th February
quotequote all
It’s just forming a barrier between the materials so a lighter grade would be OK.

jdwoodbury

Original Poster:

1,363 posts

222 months

Sunday 16th February
quotequote all
Thanks thumbup