Wet walls after heavy rain
Discussion
If you are concerned you can always paint a couple of clear coats of "Thompson's water seal" on the bottom five courses but I wouldn't bother, bear in mind sometimes it changes the colour of the brick work slightly.
https://www.screwfix.com/p/thompsons-water-seal-cl...
https://www.screwfix.com/p/thompsons-water-seal-cl...
The gound is a little high relative to the DPC and air brick level, but it's not awful, and think about the work needed to reduce that level - not worth it.
The "french drain" is probably a sprinkle of gravel over the top of the soil, so maybe dig down and see what's really there. Not hard to dig it down a foot or so and make sure it's gravel all the way.
The "french drain" is probably a sprinkle of gravel over the top of the soil, so maybe dig down and see what's really there. Not hard to dig it down a foot or so and make sure it's gravel all the way.
Mr Creosote said:
JoshSm said:
The angle makes it look weird but it's just a slightly projecting quion on the corner.
Quoin. That's a new word for me. Every day's a school day 
Snecking is the new word you want. The brickwork will cope ok OP but it’s not great to have the air bricks half buried in what is effectively a soak away. I’m guessing the paving was laid after the building was done.Mr Creosote said:
It was all done when the house was built, but I guess that patio went down last.
The air brick thing came up on the survey, actually, but the surveyor said it wasn t a huge issue - just need to keep the air bricks clear of leaves etc. it is a bit naff though, I agree.
I think at some point I will dig down two bricks and add a brick s worth of gravel so the level is just below the air bricks.
Not sure how involved you want to get but these would solve any issues re. Water getting in/blocked with leaves.The air brick thing came up on the survey, actually, but the surveyor said it wasn t a huge issue - just need to keep the air bricks clear of leaves etc. it is a bit naff though, I agree.
I think at some point I will dig down two bricks and add a brick s worth of gravel so the level is just below the air bricks.
Periscope vents.
wolfracesonic said:
Mr Creosote said:
It was all done when the house was built, but I guess that patio went down last.
The air brick thing came up on the survey, actually, but the surveyor said it wasn t a huge issue - just need to keep the air bricks clear of leaves etc. it is a bit naff though, I agree.
I think at some point I will dig down two bricks and add a brick s worth of gravel so the level is just below the air bricks.
Not sure how involved you want to get but these would solve any issues re. Water getting in/blocked with leaves.The air brick thing came up on the survey, actually, but the surveyor said it wasn t a huge issue - just need to keep the air bricks clear of leaves etc. it is a bit naff though, I agree.
I think at some point I will dig down two bricks and add a brick s worth of gravel so the level is just below the air bricks.
Periscope vents.
shtu said:
The gound is a little high relative to the DPC and air brick level, but it's not awful, and think about the work needed to reduce that level - not worth it.
The "french drain" is probably a sprinkle of gravel over the top of the soil, so maybe dig down and see what's really there. Not hard to dig it down a foot or so and make sure it's gravel all the way.
That would be my concern; where is the DPC relative to all this? It's not obvious which course of mortar it's in. Judging from the air brick things the patio is rather high; lowering it would be rather a lot of work, I'd content myself with lowering the level of the french drain and if the OP is still not happy perhaps trim back the slabs a few inches to reduce splash back.The "french drain" is probably a sprinkle of gravel over the top of the soil, so maybe dig down and see what's really there. Not hard to dig it down a foot or so and make sure it's gravel all the way.
Gassing Station | Homes, Gardens and DIY | Top of Page | What's New | My Stuff