I am looking for any electricians who could help me with some queries on a Part P job.

I have a shed down the garden (well, a carav** actially) which I am converting into a den/room for my son. I have purchased a 4 core 2.5mm armoured cable to bury to run power down there, and want to have a RCD in the house with switch board, so I can have separate switched power for Den, External Plug, Garden light.

Having looking into this, it seems taht all external work has to either be done by a Self Cert Sparks, or I need to pay my local council £70 to come and check it out. If I just run an extension lead up the garden, then this is not covered by Part P... so if I was to wire the three switches/RCD off a three pin plut, leading to the buried cable, would this be tempoary, or would I still need to get the certificate?

Failing that, anyone recommend a cheap electrician near Slough who would certify the job, if I do the digging, etc.

TIA,
Fer

benyeats

12,161 posts

261 months

Thursday 13th July 2006
quotequote all
You could of course have done the job before the regs came in

Ben

klemheist

148 posts

250 months

Thursday 13th July 2006
quotequote all
benyeats said:
You could of course have done the job before the regs came in

Ben


Assuming the cable is an old core colour type (red black blue yellow) I suppose you could.

If not when you sell the house after next July the required electrical test for the sellers pack would pick up the fact that no certificate has been issued with new cable colours and I for one would not pass it without quite comprehensive tests.
Also if you are running 3 circuits on a 4 core 6944x cable do you intend to share neutrals for lighting and power - thats a no no. I guess you dont have a valid electrical background.

If you want a blow by blow how to wire a shed I will assist, however I personally would be very doubtful about certifying someone elses work and accepting liability for it. Its all about covering backs and court cases for damage nowadays and the majority of domestic electrical work now requires certification and registration with Local Building Control.
Get a registered Part P man in (NICEIC like me or similar )to do the electrical part.

Autonotiv

2,673 posts

255 months

Thursday 13th July 2006
quotequote all
Yoe done any electrical work yourself?
Feel confident?
Know your stuff about wireing up stuff?

If thw answer is yes to all of the above, Do it yourself.

i take no responsibilty if anything goes wrong

andoverben

430 posts

271 months

Thursday 13th July 2006
quotequote all
My Brother is a Sparky I have no idea what doing what you are suggesting would cost although I can't imagine my brother would be overly keen on digging I will PM His number (He goes to Slough - based in Basingstoke) is the usual Part P etc.

I know from talking to him before that he is not overly keen on certifying opther peoples work.

xiphias

5,889 posts

258 months

Thursday 13th July 2006
quotequote all
Autonotiv said:
Yoe done any electrical work yourself?
Feel confident?
Know your stuff about wireing up stuff?

If thw answer is yes to all of the above, Do it yourself.

i take no responsibilty if anything goes wrong


I don't think you have an understanding of electricity regulations.

dilbert

7,741 posts

262 months

Thursday 13th July 2006
quotequote all
In some cases you may not be able to get away with the statement about the job being done before the regulations. If, for example, you bought the house after the regulations come in.

There's nothing to stop you plugging it in though. If you feel reasonably happy about doing it yourself, then use an armoured cable, bury it, have your dist board in the caravan, and at the house end bring the armoured cable into an exterior box.

Then just go through the wall in heavy PVC three core and stick a thirteen amp plug on the end. The only thing to make sure of is that your loads don't exceed the thirteen amps. This is quite unlikely unless you are running lots of big power tools. Even if it does, you just blow the fuse in the plug.

If you come to move, just remove the PVC cable from the socket and the exterior box at the house end. When you sell, anyone who chooses to wire it back in, does so at their own risk.

Further edited to add;

If you know what you're doing, you'll also know that this isn't the best way to do things, but heck, that's regulations. It's reasonably safe, and it keeps everyone happy.

Edited to add;

The fact that the rules now state that the colour scheme for wiring is now virtually monochrome, or each phase has the same colour, simply makes me livid. We have gone from using virtually each of the primary colours (although not quite) to a scheme which is monocrome. I always said that people affiliated with the IEE were stupid. Even though they say they're quite bright, it's obvious to me now that they're as dull as ditchwater.


Edited by dilbert on Thursday 13th July 18:58

Klemheist

148 posts

250 months

Thursday 13th July 2006
quotequote all
dilbert said:
In some cases you may not be able to get away with the statement about the job being done before the regulations. If, for example, you bought the house after the regulations come in.

There's nothing to stop you plugging it in though. If you feel reasonably happy about doing it yourself, then use an armoured cable, bury it, have your dist board in the caravan, and at the house end bring the armoured cable into an exterior box.

Then just go through the wall in heavy PVC three core and stick a thirteen amp plug on the end. The only thing to make sure of is that your loads don't exceed the thirteen amps. This is quite unlikely unless you are running lots of big power tools. Even if it does, you just blow the fuse in the plug.

If you come to move, just remove the PVC cable from the socket and the exterior box at the house end. When you sell, anyone who chooses to wire it back in, does so at their own risk.

Further edited to add;

If you know what you're doing, you'll also know that this isn't the best way to do things, but heck, that's regulations. It's reasonably safe, and it keeps everyone happy.

Edited to add;

The fact that the rules now state that the colour scheme for wiring is now virtually monochrome, or each phase has the same colour, simply makes me livid. We have gone from using virtually each of the primary colours (although not quite) to a scheme which is monocrome. I always said that people affiliated with the IEE were stupid. Even though they say they're quite bright, it's obvious to me now that they're as dull as ditchwater.


Edited by dilbert on Thursday 13th July 18:58


I agree about the IEE regs even though thats what it says on my business card, but would like to point out that just plugging into a socket aint right either. No RCD protection to the external cable unless one is fitted at the board or an rcd plug is used also try connecting a 3core 2.5mm 3183Y flex into an rcd plug top.

dilbert

7,741 posts

262 months

Thursday 13th July 2006
quotequote all
Klemheist said:
dilbert said:
In some cases you may not be able to get away with the statement about the job being done before the regulations. If, for example, you bought the house after the regulations come in.

There's nothing to stop you plugging it in though. If you feel reasonably happy about doing it yourself, then use an armoured cable, bury it, have your dist board in the caravan, and at the house end bring the armoured cable into an exterior box.

Then just go through the wall in heavy PVC three core and stick a thirteen amp plug on the end. The only thing to make sure of is that your loads don't exceed the thirteen amps. This is quite unlikely unless you are running lots of big power tools. Even if it does, you just blow the fuse in the plug.

If you come to move, just remove the PVC cable from the socket and the exterior box at the house end. When you sell, anyone who chooses to wire it back in, does so at their own risk.

Further edited to add;

If you know what you're doing, you'll also know that this isn't the best way to do things, but heck, that's regulations. It's reasonably safe, and it keeps everyone happy.

Edited to add;

The fact that the rules now state that the colour scheme for wiring is now virtually monochrome, or each phase has the same colour, simply makes me livid. We have gone from using virtually each of the primary colours (although not quite) to a scheme which is monocrome. I always said that people affiliated with the IEE were stupid. Even though they say they're quite bright, it's obvious to me now that they're as dull as ditchwater.


Edited by dilbert on Thursday 13th July 18:58


I agree about the IEE regs even though thats what it says on my business card, but would like to point out that just plugging into a socket aint right either. No RCD protection to the external cable unless one is fitted at the board or an rcd plug is used also try connecting a 3core 2.5mm 3183Y flex into an rcd plug top.


Well, I didn't say it was the best plan, and yes, another RCD has to be a must. Personally I'd stick it in the remote board, where it really ought to be. I think my point is that the way the regs are, this approach seems like an acceptable one to me.

Autonotiv

2,673 posts

255 months

Thursday 13th July 2006
quotequote all
xiphias said:
Autonotiv said:
Yoe done any electrical work yourself?
Feel confident?
Know your stuff about wireing up stuff?

If thw answer is yes to all of the above, Do it yourself.

i take no responsibilty if anything goes wrong


I don't think you have an understanding of electricity regulations.


errrrrrrrrrrrrr, yes i do thanks, but for what his has to do, if he is confident in himself, then he may aswell just do it himself!

SuPaSpArK

2,105 posts

269 months

Thursday 13th July 2006
quotequote all
Gland 4 core into RCD side of Domestic consumer unit (20amp breaker). Run and bury 4 core SWA no less than 50cm to caravan. Install 2 way RCD consumer unit at remote point (wire external lighting and sockets from this point). Install earth rods into ground and connect min 10mm earth cable to rods and remote RCD consumer unit. test installation.
You have to treat the installation as a sub-main to fully comply with regs....
Don't cut corners especially when there are kids involved!
Good luck.
Supes.

littlegreenfairy

10,134 posts

252 months

Thursday 13th July 2006
quotequote all
Autonotiv said:

errrrrrrrrrrrrr, yes i do thanks, but for what his has to do, if he is confident in himself, then he may aswell just do it himself!


I wish I was 16 again and knew all the answers.

Autonotiv

2,673 posts

255 months

Thursday 13th July 2006
quotequote all
littlegreenfairy said:
Autonotiv said:

errrrrrrrrrrrrr, yes i do thanks, but for what his has to do, if he is confident in himself, then he may aswell just do it himself!


I wish I was 16 again and knew all the answers.


you don't know me! so you realy don't know what i know!

xiphias

5,889 posts

258 months

Thursday 13th July 2006
quotequote all
Autonotiv said:
xiphias said:
Autonotiv said:
Yoe done any electrical work yourself?
Feel confident?
Know your stuff about wireing up stuff?

If thw answer is yes to all of the above, Do it yourself.

i take no responsibilty if anything goes wrong


I don't think you have an understanding of electricity regulations.


errrrrrrrrrrrrr, yes i do thanks, but for what his has to do, if he is confident in himself, then he may aswell just do it himself!


Is there anything you don't know the answer to? If you understood electricity regulations why don't you answer the question, instead of being a post whore who seems to know the answer to everything.

On topic, the new colour scheme is useless. Especially when trying to wire it into the old scheme.

2 sMoKiN bArReLs

32,050 posts

266 months

Thursday 13th July 2006
quotequote all
Does a post whore get paid?

Autonotiv

2,673 posts

255 months

Thursday 13th July 2006
quotequote all
xiphias said:

On topic, the new colour scheme is useless. Especially when trying to wire it into the old scheme.


How?

littlegreenfairy

10,134 posts

252 months

Thursday 13th July 2006
quotequote all
2 sMoKiN bArReLs said:
Does a post whore get paid?


It looks like it.

monkeyhanger

9,268 posts

273 months

Thursday 13th July 2006
quotequote all
Autonotiv said:
xiphias said:

On topic, the new colour scheme is useless. Especially when trying to wire it into the old scheme.


How?


If it ain't broke don't try and fix it.

The old colour scheme was tried and tested. Harmonisation is a load of bollox.

SuPaSpArK

2,105 posts

269 months

Thursday 13th July 2006
quotequote all
monkeyhanger said:
Autonotiv said:
xiphias said:

On topic, the new colour scheme is useless. Especially when trying to wire it into the old scheme.


How?


If it ain't broke don't try and fix it.

The old colour scheme was tried and tested. Harmonisation is a load of bollox.


I'm on a mixed colour job at the moment.....It's a feckin nightmare..going through PVC tape like there is no tomorrow.....load of bolloshes.

monkeyhanger

9,268 posts

273 months

Thursday 13th July 2006
quotequote all
SuPaSpArK said:


I'm on a mixed colour job at the moment.....It's a feckin nightmare..going through PVC tape like there is no tomorrow.....load of bolloshes.


Exactly.

Coloured tapes like Xmas decorations, stickers at the point of interface for JB's...

They must have been on drugs when they thought this one up. Part P's a load of crap too. Just a money making scheme for the NICEIC & co IMHO.