Ive given the Builder the boot - usless *anker

incompetant twat, the extension was supposed to be finished for Christmas

Thing is I have still got most of his tools: cement mixer, very nice cordless hammer drill, kango, skill saws etc to name a few at my place. ive phoned him and told him to come and collect the but he hasnt arrived probably aware that Mrs m is waiting with a rolling pin.

we are somewhat restricted for space as I am trying to finish the bathroom, kitchen and playroom all at the same time as decorating the bedroom, mind you the tools have come in useful oner the weekend and a mate wants to borrow the mixer if it was to get stolen from the front garden can I be held responsible???
And what if he doesnt come and collect his tools, can I keep them?

griff2be

5,105 posts

295 months

Monday 10th February 2003
quotequote all
Dunno.

Don't suppose he's left a big stack of plasterboard, WBP plywood and a Paslode nailer has he?

incorrigible

13,668 posts

289 months

Monday 10th February 2003
quotequote all
Bloke with a van and cash, available at your request

Don't know where you stand legally though

ninja_eli

1,525 posts

295 months

Monday 10th February 2003
quotequote all

griff2be said: Dunno.

Don't suppose he's left a big stack of plasterboard, WBP plywood and a Paslode nailer has he?


Marcos maniac

Original Poster:

3,148 posts

289 months

Monday 10th February 2003
quotequote all

griff2be said: Dunno.

Don't suppose he's left a big stack of plasterboard, WBP plywood and a Paslode nailer has he?


Nope sorry

Loads of gyproc insulation boards in the shed and half a pallet of cement, coils of electrical cable (one is now only half a coil) bags of plaster, boxes of nails and screws and what i am told by a mate is a laser level.

angusfaldo

2,830 posts

302 months

Monday 10th February 2003
quotequote all
His name wasn't Bob was it?

Marcos maniac

Original Poster:

3,148 posts

289 months

Monday 10th February 2003
quotequote all

angusfaldo said: His name wasn't Bob was it?




more like Bodge

dave_s13

14,015 posts

297 months

Monday 10th February 2003
quotequote all
Inform him that you are no longer prepared to store his materials and that if he doesn't turn up and collect them you will be leaving said items out on the front lawn/in street for him to collect at his leisure.

Obviously what happens to them at that point is purely up to your mate who wants the mixer etc...

griff2be

5,105 posts

295 months

Monday 10th February 2003
quotequote all

Marcos maniac said:

griff2be said: Dunno.

Don't suppose he's left a big stack of plasterboard, WBP plywood and a Paslode nailer has he?


Nope sorry

Loads of gyproc insulation boards in the shed and half a pallet of cement, coils of electrical cable (one is now only half a coil) bags of plaster, boxes of nails and screws and what i am told by a mate is a laser level.





Well if I had a Chimaera rather than a Griff, I'd be round for the insulation boards

plipton

1,302 posts

286 months

Monday 10th February 2003
quotequote all
Best check with the local plod.

If he turns nasty at least they will have it on record you sought their advice.

jondokic

385 posts

295 months

Monday 10th February 2003
quotequote all
In a similar situation (except the tool in question was a sodding great aerator) my solicitor sent a letter saying that unless the item was collected costs would be sought relating to the outstanding work and storage of the tools. I never heard anything back from the contractor, so once the costs had reached a similar value to that of the aerator we issued another letter saying we were going to keep it, or dispose of it in lieu of costs. It is in my barn as now, four years later. I think a similar letter might be a good idea on this one, as I would suspect that the builder could claim he expected you to leave his tools undisturbed for a reasonable period.

Marcos maniac

Original Poster:

3,148 posts

289 months

Monday 10th February 2003
quotequote all



If he turns nasty




that would make my day, mind you the dogs are getting a bit peed off sharing the shed/kennel with his materials.

Think he might be a bit nervous about facing the wrath of Mrs M
edited cause I cant spell

>> Edited by Marcos maniac on Monday 10th February 16:29

Marcos maniac

Original Poster:

3,148 posts

289 months

Monday 10th February 2003
quotequote all

jondokic said: In a similar situation (except the tool in question was a sodding great aerator) my solicitor sent a letter saying that unless the item was collected costs would be sought relating to the outstanding work and storage of the tools. I never heard anything back from the contractor, so once the costs had reached a similar value to that of the aerator we issued another letter saying we were going to keep it, or dispose of it in lieu of costs. It is in my barn as now, four years later. I think a similar letter might be a good idea on this one, as I would suspect that the builder could claim he expected you to leave his tools undisturbed for a reasonable period.


Good idea: gonna fax him now and give him seven days to collect them, if not i will deposit them in the skip that has been sitting on my drive for the last two months the skip company won't collect it unless i pay them as the cheque he gave them bounced