I read on this forum recently that a change in speed limit from NSL to 30 had to be stepped down to 40 between these limits.
On the road this morning I noticed 2 instances where it dropped straight from NSL to 30 with cameras soon after the limit change.
Is this a guideline or a legal requirement? Or just untrue?
On the road this morning I noticed 2 instances where it dropped straight from NSL to 30 with cameras soon after the limit change.
Is this a guideline or a legal requirement? Or just untrue?
Edited by CaptainSlow on Friday 3rd November 14:36
CaptainSlow said:
I read on this forum recently that a change in speed limit from NSL to 30 had to be stepped down to 40 between these limits.
On the road this morning I noticed 2 instances where it dropped straight from NSL to 30 with cameras soon after the limit change.
Is this a guideline or a legal requirement? Or just untrue?
On the road this morning I noticed 2 instances where it dropped straight from NSL to 30 with cameras soon after the limit change.
Is this a guideline or a legal requirement? Or just untrue?
Edited by CaptainSlow on Friday 3rd November 14:36
No effort to make money there then.

Nope its not in legislation, but apparently there may be a traffic notes circular somewhere in the depths of the DfT. Personally I've never seen it but that means nothing in the overall scheme of things.
I have also seen on a motorway link road subject to road works the limit go from 70 to 20 in one hit. Admittedly only a muppet would have actually been doing 70 approaching the scene, but that was the limit technically in force. The 20 sign was just round a bend too, and no countdown markers either.
Not nice, not clever.
I have also seen on a motorway link road subject to road works the limit go from 70 to 20 in one hit. Admittedly only a muppet would have actually been doing 70 approaching the scene, but that was the limit technically in force. The 20 sign was just round a bend too, and no countdown markers either.
Not nice, not clever.
7db said:
Countdown markers are in a DfT circular - strongly discouraging their use. (Rightly so, in my view).
If you are referring to circular 1/06 it does accept they have a place where "if there is a particular problem with road users seeing terminal gateway speed limit signs in good time."