A good start....
Discussion
December 18th - metalwork for broken leg taken off (after 11 months).
December 19th - start looking for good deal on Elise.
February 9th - put deposit on Elise S.
March 1st - go to see doc about pain in leg over last three weeks.
March 4th - metalwork back on, 3 days in hospital, been walking round for three weeks on broken leg (apparently).
March 15th - Elise S arrives....
Still, a pre-op request to a friendly NHS surgeon has meant that the metalwork is offset to the left so no catching on the side of the tub when my foot's on the loud pedal. And I've got the all clear to drive "when I feel up to it". So she won't have to sit in the garage for the next three months (but she will have to be driven as though by a nun - no bad thing for my first Elise).
Takes me five minutes to get in and out though and is even more amusing than the normal entry/exit methods!
December 19th - start looking for good deal on Elise.
February 9th - put deposit on Elise S.
March 1st - go to see doc about pain in leg over last three weeks.
March 4th - metalwork back on, 3 days in hospital, been walking round for three weeks on broken leg (apparently).
March 15th - Elise S arrives....
Still, a pre-op request to a friendly NHS surgeon has meant that the metalwork is offset to the left so no catching on the side of the tub when my foot's on the loud pedal. And I've got the all clear to drive "when I feel up to it". So she won't have to sit in the garage for the next three months (but she will have to be driven as though by a nun - no bad thing for my first Elise).
Takes me five minutes to get in and out though and is even more amusing than the normal entry/exit methods!