Body off, how hard?
Discussion
It's not that bad, just time consuming!
I'm just finishing mine, 6 inch lift with no help except a local welding company to replace all the outriggers. Only engine and gearbox not removed just mounts replaced, everything else has been removed and refurbished or replaced. It has taken about 4-5 months of evenings and Sundays. I see you live in south Wales; I’m between Newport and Chepstow so you are very welcome to come and have a look at how to lift the body before it’s lowered in the next week or so. Target is on the road for the May Bank Holiday.
There is a good guide at the start of the Griff forum and in the Chimaera pages, PM me if you what to know more.
PurpleV8
I'm just finishing mine, 6 inch lift with no help except a local welding company to replace all the outriggers. Only engine and gearbox not removed just mounts replaced, everything else has been removed and refurbished or replaced. It has taken about 4-5 months of evenings and Sundays. I see you live in south Wales; I’m between Newport and Chepstow so you are very welcome to come and have a look at how to lift the body before it’s lowered in the next week or so. Target is on the road for the May Bank Holiday.
There is a good guide at the start of the Griff forum and in the Chimaera pages, PM me if you what to know more.
PurpleV8
From memory,
Get car as high as possible on 4 good axel stands
Remove battery
Drain and remove fuel tank
Drain and remove radiator
Remove both front chassis bolts (below radiator) and disconnect wiring loom from oil pressure sensor etc
Remove 2 chassis bolts from front top of centre console (for this and next step, if you plan to replace carpet soon just cut a small section to allow access save loads of time)
Remove 14 bolts going through the floor and through the chassis plates
Remove the 4 seat belt mounting bolts
Remove the 4 bolts from behind the fuel tank
Disconnect the steering shaft at the lower UJ
Remove 90 degree section of air intake hose
Cut some of the cable ties that hold the brake lines near the starter motor and any tight cables between body and chassis ie speed sensor, reverse switch etc to allow some flex when you lift
Slacken off hand brake adjuster to allow a almost vertical lever
Remove gear knob
Lift using a jacks and wood to spread the load or 6 + people and support body on wood across the top of the upper shock mounts front and rear
This will only give a couple of inches due to the exhaust manifolds fouling in the body and is only really enough to clean and repaint the tops of the outriggers. If any welding is needed I would recommend removing the exhaust system including the manifolds as in the guide at the start of the Griff forum. I did mine this way, lifting 6-7 inches to replace all the outriggers but left the main engine loom, starter wiring, clutch and brake lines connected.
I’m sure someone will point out anything I’ve missed.
Purple V8
Get car as high as possible on 4 good axel stands
Remove battery
Drain and remove fuel tank
Drain and remove radiator
Remove both front chassis bolts (below radiator) and disconnect wiring loom from oil pressure sensor etc
Remove 2 chassis bolts from front top of centre console (for this and next step, if you plan to replace carpet soon just cut a small section to allow access save loads of time)
Remove 14 bolts going through the floor and through the chassis plates
Remove the 4 seat belt mounting bolts
Remove the 4 bolts from behind the fuel tank
Disconnect the steering shaft at the lower UJ
Remove 90 degree section of air intake hose
Cut some of the cable ties that hold the brake lines near the starter motor and any tight cables between body and chassis ie speed sensor, reverse switch etc to allow some flex when you lift
Slacken off hand brake adjuster to allow a almost vertical lever
Remove gear knob
Lift using a jacks and wood to spread the load or 6 + people and support body on wood across the top of the upper shock mounts front and rear
This will only give a couple of inches due to the exhaust manifolds fouling in the body and is only really enough to clean and repaint the tops of the outriggers. If any welding is needed I would recommend removing the exhaust system including the manifolds as in the guide at the start of the Griff forum. I did mine this way, lifting 6-7 inches to replace all the outriggers but left the main engine loom, starter wiring, clutch and brake lines connected.
I’m sure someone will point out anything I’ve missed.
Purple V8
pwd95 said:
Wouldn't mind having a go at this myself one of these winters. Let me know if you have a go & I'll pop over & give you a hand. 
You'r not going on the South Wales run tomorrow are you?
Only just found about the run, so guess ive missed itnow.You'r not going on the South Wales run tomorrow are you?
I am going to have to do it myself, as i cant seemt o find anyone local, and obviously the cost side too.
some help would be great, and gladly returned when you do yours
Gassing Station | Chimaera | Top of Page | What's New | My Stuff


