Orange bags on M6 gantries - J5-6 (and beyond?)
Orange bags on M6 gantries - J5-6 (and beyond?)
Author
Discussion

Big Bad Ben

Original Poster:

251 posts

268 months

Friday 23rd May 2008
quotequote all
On my way to work this morning, I noticed the above - was wondering if they were covering some new revenue generators average speed cameras? Does anyone know of any plans to have these installed on this stretch of the M6?

I was only going from the A38(M) to the M42, so I don't know how far along they go...


Apologies if this is a repost/in the wrong forum

Winact

13 posts

222 months

Tuesday 27th May 2008
quotequote all
From what I saw, they are looking a lot like SPECS cameras, one of the orange bags you mention had blown off as I passed by them this morning. Having said that they are a bit odd for SPECS in that although they are gantry mounted there didn't seem to be enough to cover all the lanes on every gantry???

Interested to hear what people think about them too- anyone from the Brum area read anything in the local press?

Cheers Win

dan1981

18,130 posts

230 months

Tuesday 27th May 2008
quotequote all
they are starting resurfacing today i think.

all lanes will remain open but lower speed limits will be enforced. i guess thats what they are for!

streaky

19,311 posts

280 months

Wednesday 28th May 2008
quotequote all
Highways Agency said:
The Project
Where?
The scheme is located on the Southbound carriageway of the M6 from 2.5km (1.5m) east of Junction 6 at Gravelly Hill to Junction 5 at Castle Bromwich.

When?
The work is programmed to start on carriageway on Tuesday 27th May for approximately 11 weeks.

What are we doing?
We will remove the existing surface down to the waterproofing material and replace it with a new, quieter, surfacing layer. We will replace the bridge joints and put in an improved drainage system to reduce damage to the carriageway deck structure.

Why do we need to do this work ?
Due to wear and tear, the surface has come to the end of its serviceable life and needs replacing. The waterproofing and drainage of the motorway needs to be repaired to ensure that water does not seep down into the concrete structure supporting the viaduct.

Traffic Management
Please note that this information is not updated in real time. Please check Traffic England for the latest information and current traffic conditions.

The work will be carried out on all three lanes and hard shoulder of the southbound carriageway and traffic will be controlled by means of a contra-flow system as given below;

06.00 to 22.00hrs daytime operations
For northbound traffic there will be three lanes running.
For southbound traffic there will be two lanes running on the southbound carriageway, and one lane running south, but on the northbound carriageway.
The single southbound lane will be subject to a contra-flow facility.

22.00 to 06.00hrs night time operations
For northbound traffic there will be three lanes running.
For southbound traffic there will be one lane running south only, but on the northbound carriageway.
The single southbound lane will be subject to a contra-flow facility.

To facilitate the introduction of narrowed lanes for the works, the M6 will be closed overnight for the following times:

Southbound only Tuesday 20th May between 22.00 and 06.00
Northbound only Wednesday 21h May between 22.00 and 06.00
Northbound only Tuesday 27th May between 22.00 and 06.00
Southbound only Wednesday 28th May between 22.00 and 06.00
When this occurs, a signed diversion route along the A452 Chester Road and A38 Tyburn Road will be in place.

Speed Limit
A 50mph speed limit will be in force for the duration of the works. This will be enforced by "average speed check" cameras for the safety of the workforce, working close to moving traffic.
So SPECS it is.

Streaky