Hi folks, I'm looking at tiling a conservatory floor which will have insulation then concrete screed and then dry underfloor heating in a latex screed.

How long do I need to wait before tiling it. I've heard a week otherwise the 'salts'? will rise up through the floor into the tiles. Does anybody who knows about this stuff agree with this figure or does it depend on screed thickness?

What do people think?

ff5317

453 posts

256 months

Wednesday 16th July 2008
quotequote all
Depends on the type of tiles you're going to put down as to whether or not the salts will bleed through. Ideally you should leave 1 day per mm thickness of the screed up to 50mm plus 1 week for every mm over 50mm, as drying time. Not many people have this luxury though, so you could use a surface dpm on the screed after about a week, then carry on as normal. If the tiles are a glazed ceramic you won't have any problem with bleed through anyway.
HTH

anonymous-user

Original Poster:

85 months

Wednesday 16th July 2008
quotequote all
Cheers. Yes they're travertine so I think I need to wait.

The figure I had was a week per inch of screed and thought it seemed rather a long time.