Concrete Floor Screed?
Author
Discussion

Davi

Original Poster:

17,153 posts

251 months

Sunday 27th July 2008
quotequote all
Anyone know how to floor screed using C25 concrete with polypropylene fibre? Specced to 50mm slump if that makes a difference!

Know how to screed using... erm... screed, but never done it with concrete before! Is C25 with 50mm slump going to be similarly dry to normal screed, so I can just tamp and float it off, or am I looking at a whole different ball game?

Ta.

miniman

30,234 posts

293 months

Sunday 27th July 2008
quotequote all
C25? Slump? Ball?

I'd get a man in. hehe

AndrewW-G

11,968 posts

248 months

Sunday 27th July 2008
quotequote all
From what I can remember from pouring my workshop floor, C25 is just normal concrete (6 parts mixed agregate to 1 cement)not sure about the aditives though
it was a fairly stiff mix and had to be tamped down prior to floating.......bloody hard work but similar to doing a none concrete dry'ish screed

Mr_B

10,480 posts

274 months

Sunday 27th July 2008
quotequote all
50 slump is wet concrete. Not hugely wet like piss water, but still wet enough to get a finish on the surface with a tamp. Proper 50 slump would heap up into a pile, but most concrete places would usually make it wetter than that as it would be hard to work at a true 50 slump. How is it being delivered to you ? By that I mean are they waiting while you barrow it ?

topjay

787 posts

249 months

Sunday 27th July 2008
quotequote all
It shoudn't cause you any real drama, its not to hard to do, if its a large area get a power float to get it smoothe. Also keep it covered if its hot to slowly dry or it will crack even with polyfibre.

Davi

Original Poster:

17,153 posts

251 months

Sunday 27th July 2008
quotequote all
Mr_B said:
50 slump is wet concrete. Not hugely wet like piss water, but still wet enough to get a finish on the surface with a tamp. Proper 50 slump would heap up into a pile, but most concrete places would usually make it wetter than that as it would be hard to work at a true 50 slump. How is it being delivered to you ? By that I mean are they waiting while you barrow it ?
Cheers, if it's wet it could be quite interesting - it's not a huuuge area, only 18sqm - but access to one long side is roughly nill, so it's going to mean getting the wellies on frown Also slightly more complex as the surface it's being laid on you can't walk on so it'll have to be boarded out and each board lifted as the next bit is done.

It's coming in a (rather advanced!) mix-as-you-go type wagon and they allow 25 mins per m3 to barrow it round - I'm thinking get it roughly right then get 4 or 5 barrow loads heaped on some plastic sheet to top off with if we are a bit low (I've got some retaining wall founds that any excess can go in!)

Power-floating was mentioned to me by one of the companies I contacted, what is it exactly? Only thing I can picture is one of those compacter plates which would go straight through the polystyrene undersurface hehe

Mr_B

10,480 posts

274 months

Sunday 27th July 2008
quotequote all
If you have a volumetric batching truck, then the driver/operator can alter the slump ( wetness ) of the concrete from dry to wet from one wheel barrow to the next. Although I don't know how he would add fibres to the mix and this is usually only done with pre-mixed concrete arriving in a drum type truck.
Power floating is a process that get the floor perfectly smooth to an almost shine. This requires a machine that looks like a fan sweeping on the concrete surface.Go to places like B&Q or any large tye warehouse and you'll see what I mean. There's an art to that - really need to know what you are doing there. Here's a pic of a small float. The twin fan seated ones are quite good fun in a hovercraft kinda way smile



Volumetric batching truck

http://www.xactmixers.com/volumetricmixer2.html

Davi

Original Poster:

17,153 posts

251 months

Sunday 27th July 2008
quotequote all
Mr_B said:
If you have a volumetric batching truck, then the driver/operator can alter the slump ( wetness ) of the concrete from dry to wet from one wheel barrow to the next. Although I don't know how he would add fibres to the mix and this is usually only done with pre-mixed concrete arriving in a drum type truck.
Power floating is a process that get the floor perfectly smooth to an almost shine. This requires a machine that looks like a fan sweeping on the concrete surface.Go to places like B&Q or any large tye warehouse and you'll see what I mean. There's an art to that - really need to know what you are doing there. Here's a pic of a small float. The twin fan seated ones are quite good fun in a hovercraft kinda way smile



Volumetric batching truck

http://www.xactmixers.com/volumetricmixer2.html
Many thanks smile

Not sure how he's adding the fibres either, he said it wouldn't be a problem - though I could go for the alternative which would be A98 mesh - I'll have a look into that in the morning. Don't really want to get a readymix out as the cost for just the empty area is greater than the cost of the concrete from the batchmix chap!

Hmmm interesting looking device - plenty of scope to go wrong, I think I'll give it a bash biggrin

Mr_B

10,480 posts

274 months

Sunday 27th July 2008
quotequote all
Its either the VBT or the low tech truck with a mountain of ballst and a mixer on the back and all done by hand.

extvr

1,136 posts

245 months

Sunday 27th July 2008
quotequote all
They can add the fibres at the end of the belt so they mix in through the auger.

Davi

Original Poster:

17,153 posts

251 months

Sunday 27th July 2008
quotequote all
definitely high tech - I asked him if it was "one of those big mixers on the back of a flat bed" and he was extremely insulted tongue out

Looking at those pages on the link further I can see how they could add the fibre on the belt, though it might just be easier to go for the A98 anyway, depends on the cost - the fibres are very cheap!

King Herald

23,501 posts

247 months

Sunday 27th July 2008
quotequote all
Davi said:
It's coming in a (rather advanced!) mix-as-you-go type wagon and they allow 25 mins per m3 to barrow it round - I'm thinking get it roughly right then get 4 or 5 barrow loads heaped on some plastic sheet to top off with if we are a bit low (I've got some retaining wall founds that any excess can go in!)
I had my garage floor laid by one of them new fangled mix-as-you-go machines, but the two guys had to wheelbarrow the stuff down my drive, through my garage, and into the back garden, maybe 70 feet. Took them just 1 1/2 hours to barrow 5 cubes, approx 12 ton of the stuff!!!! And that was with one guy helping me to tamp down with a long beam.



This was the route they took, all the way from t'other side of the main road, as our kindly neighbours use the road outside our house as a car park.

I'm also wondering why you say the base can't be walked on?


mrmaggit

10,146 posts

279 months

Monday 28th July 2008
quotequote all
Davi said:
Anyone know how to floor screed using C25 concrete with polypropylene fibre? Specced to 50mm slump if that makes a difference!

Know how to screed using... erm... screed, but never done it with concrete before! Is C25 with 50mm slump going to be similarly dry to normal screed, so I can just tamp and float it off, or am I looking at a whole different ball game?

Ta.
C25 is readymixed concrete, 50mm slump refers to the amount it "slumps" or settles as it's poured. Screed is a different product altogether, in that it doesn't have the small stones in it.

Usual mixes for screed are 1:4 or 1:3, fibres are added to bond the screed together, to save you having to use mesh, which is now getting quite expensive.

Screed is laid over the readymix, usually 50mm thick, but can be thinner or thicker.

You should be able to get an adequate finish on readymix with a tamp and trowel.

Davi

Original Poster:

17,153 posts

251 months

Monday 28th July 2008
quotequote all
King Herald said:
...but the two guys had to wheelbarrow the stuff down my drive, through my garage, and into the back garden, maybe 70 feet. Took them just 1 1/2 hours to barrow 5 cubes, approx 12 ton of the stuff!!!! And that was with one guy helping me to tamp down with a long beam.

...

I'm also wondering why you say the base can't be walked on?
We have similar issues - For the foundations I had to hire a pumping lorry capable of shifting the concrete >30m - now that was no fun whatsoever! Pump lorry had the hose up over the side of the house in rigid sections then lengths of "flexible" pipe running the rest of the way - flexible is certainly not a word I'd have chosen for the pipes though, 4 of us struggled to shift them once pumping had started.

The floor base itself is a system called Jetfloor, which is a suspended floor like beam and block, only the gaps between the beams are not filled with concrete blocks before the insulation and screed is applied, just large EPS polystyrene profiles. Once the concrete is poured and set it becomes incredibly strong (and extremely insulative) however till its set... the weight of a bloke would go straight through the polystyrene slabs. The concrete can be poured from a height of no more than 1ft either or it'll break the slabs, and they aren't cheap. No screed over the top of the concrete though, just the C25 to form the finished surface with (which is why I'm nervous...)

King Herald

23,501 posts

247 months

Monday 28th July 2008
quotequote all
Davi said:
King Herald said:
...but the two guys had to wheelbarrow the stuff down my drive, through my garage, and into the back garden, maybe 70 feet. Took them just 1 1/2 hours to barrow 5 cubes, approx 12 ton of the stuff!!!! And that was with one guy helping me to tamp down with a long beam.

...

I'm also wondering why you say the base can't be walked on?
We have similar issues - For the foundations I had to hire a pumping lorry capable of shifting the concrete >30m - now that was no fun whatsoever! Pump lorry had the hose up over the side of the house in rigid sections then lengths of "flexible" pipe running the rest of the way - flexible is certainly not a word I'd have chosen for the pipes though, 4 of us struggled to shift them once pumping had started.

The floor base itself is a system called Jetfloor, which is a suspended floor like beam and block, only the gaps between the beams are not filled with concrete blocks before the insulation and screed is applied, just large EPS polystyrene profiles. Once the concrete is poured and set it becomes incredibly strong (and extremely insulative) however till its set... the weight of a bloke would go straight through the polystyrene slabs. The concrete can be poured from a height of no more than 1ft either or it'll break the slabs, and they aren't cheap. No screed over the top of the concrete though, just the C25 to form the finished surface with (which is why I'm nervous...)
I looked at pumping for my floor, but they wanted £200 extra just to hire the pump, plus the cost of the concrete, which made it too expensive. I got a deal off a PHer (embarrassingly I can't remember his name now), but it was as good a price as I expected to get.

I've seen pumps that use a 3" flexi hose to get the sticky stuff where it needs to go. Probably turn one up on a Google search. It sounds like you have a pretty high tech construction going on there, so wasn't concrete a supply system checked out too at the start?

Davi

Original Poster:

17,153 posts

251 months

Monday 28th July 2008
quotequote all
King Herald said:
I looked at pumping for my floor, but they wanted £200 extra just to hire the pump, plus the cost of the concrete, which made it too expensive. I got a deal off a PHer (embarrassingly I can't remember his name now), but it was as good a price as I expected to get.

I've seen pumps that use a 3" flexi hose to get the sticky stuff where it needs to go. Probably turn one up on a Google search. It sounds like you have a pretty high tech construction going on there, so wasn't concrete a supply system checked out too at the start?
I'd have been seriously happy with £200 for the pump hire... frown

It's not really as high tech as it sounds, I'm just feeling my way through it, the "team" involved on this job involves me, erm.... me and... oh - Dad comes down when it needs an extra pair of hands biggrin It's an awkward build as the edge of the extension is 2ft from a 4m drop. Just means loads of research on each step! This was one bit I was getting help with and was all covered off a few months back, but yet another company have let me down so it's down to me.

Edited by Davi on Monday 28th July 10:30