Had to get a big coach in to London yesterday (was cheaper than the train) and we entered the city off the M11, going past the future Olympic site.

I really hope they know what they're doing as all I could see was loads of mud, huge piles of dirt, and a few diggers. It's 4 years away and considering how much needs building around there I really hope they start digging the foundations or something soon.

Also, even though it was 10:30 in the morning, there wasn't a single person on the site. Either every single person there was on their tea break, or they've all buggered off somewhere else.

The rest of the journey took us through east London, particularly Bow, Stratford etc (the bus was going to Victoria). The "regeneration" of the area is...interesting. Some really beautiful new buildings, like the new Muslim Centre, but they just make the rest of the place look three times as bad. It's not grafitti, of which there was surprisingly little, just dirty buildings, boarded up windows, etc etc etc. The whole of that area just needs a gigantic bucket of paint tipped over it (there's only so much a bulldozer can do).

V8mate

45,899 posts

220 months

Wednesday 6th August 2008
quotequote all
The construction project is ahead of schedule.


At the moment.

MentalSarcasm

Original Poster:

6,083 posts

242 months

Wednesday 6th August 2008
quotequote all
Ah, so that explains the extended tea breakwink

Bing o

15,184 posts

250 months

Wednesday 6th August 2008
quotequote all
I'm sure that it will top this when it's built...


Swilly

9,699 posts

305 months

Wednesday 6th August 2008
quotequote all
V8mate said:
The construction project is ahead of schedule.


At the moment.
Which schedule !?

And is that schedule accurate/reliable !?

;)


Edited by Swilly on Wednesday 6th August 09:49