Hey let's close the M25 just before rush hour for a laugh
Discussion
"M3 Surrey - Exit slip road to the anticlockwise M25 closed northbound at J2, Thorpe Interchange, because of an overturned lorry. Diversion in operation."
Does someone calculate the ££££s lost for whimsical road closures? Who's held to account when the cost/benefit analysis doesn't add up?
Surely most times at least one lane can be quickly cleared?
SM
ps I understand the marginal benefit of "scene of crime" work, but this can't apply very often and since we have whole load of nothing instead of any road safety policy, any findings aren't worth the bother.
Does someone calculate the ££££s lost for whimsical road closures? Who's held to account when the cost/benefit analysis doesn't add up?
Surely most times at least one lane can be quickly cleared?
SM
ps I understand the marginal benefit of "scene of crime" work, but this can't apply very often and since we have whole load of nothing instead of any road safety policy, any findings aren't worth the bother.
supermono said:
"M3 Surrey - Exit slip road to the anticlockwise M25 closed northbound at J2, Thorpe Interchange, because of an overturned lorry. Diversion in operation."
Does someone calculate the ££££s lost for whimsical road closures? Who's held to account when the cost/benefit analysis doesn't add up?
Yes 'they' do. "Whimsical" isn't the word I'd choose to use! Does someone calculate the ££££s lost for whimsical road closures? Who's held to account when the cost/benefit analysis doesn't add up?
Some assumptions commonly used by the Highways Agency's National Operations Group include:
- On average 2000 critical incidents occur every year on the English strategic road network
- The average duration of a critical incident is 3.8 hours
- The average cost to the UK of a single vehicle hour delay on the network is £11.28
- The average flow per hour at any point on the strategic network is 1794 vehicles
Based on the above statistics (and I use that word loosely), an incident involving a total road closure will cost UK PLC on average £4,140 for every kilometre of traffic delayed by one hour.
A total road closure of 1 hour will create a 5km queue of stationary traffic.
However, this is an average figure based on flows for the whole strategic road network, and major motorways are likely to average at a much higher figure than mentioned above. Naturally, the M25 is a major motorway.
This is a crude assessment of the costs to the UK PLC, as the figures do not include the time it would take for the network to recover, but simply covers the timeframe for the initial closure of the motorway.
In reality the costs to the economy are much higher. In order to obtain a more refined assessment of the costs, the time taken for the network to reach “normal” journey times after a closure should be considered alongside variables likely to be included, such as the following:
- strategic / tactical signing
- rear-ward relief through the Traffic Officer Service
- diversion routes
The time for a road network to return to normality after such a closure, can be quite significant, in reality every additional hours delay costs the economy more money.
Indirect Costs
The figures quoted only highlight the direct cost to UK PLC, there are however many indirect costs related to incidents occurring on the network that need to be considered. Costs relating to:
- The loss of life or serious injury during an incident, which impacts, upon relatives and colleagues.
- Incident related congestion on the environment, including increases in emissions, such as oxides of nitrogen, carbon monoxide, and fine particle matter. This not only affects the local air quality but also contributes to greenhouse gases.
If you *really* cared you'd read the Transport Analysis Guidance here http://www.webtag.org.uk/webdocuments/doc_index.ht...
But it's tough going

edited to add: I should point out I got that info from the HA website, and added some bits. If you want to know the answer to this specific incident, I expect you could make a FOI request in a couple of weeks, once the debriefs have been completed, and get a (possibly(ish)) definitive answer.
Edited by bigandclever on Monday 8th September 18:13
bigandclever said:
an incident involving a total road closure will cost UK PLC on average £4,140 for every kilometre of traffic delayed by one hour.
I'd hazard a guess that either there are several zeros missing from that figure, or that it's an average which is drawn from figures including both the M25 and all the single-track rural lanes in far-flung counties. A single delayed truck carrying fresh produce could lose far more than £4k all on it's own.The reason that we have so many more closures now is simply down to the agressive litigation/blame culture which we've absorbed from the USA. In order to avoid being sued, all parties involved feel obliged to cover every pimple on their collective arses, hence a complete road closure allows full forensic examination of every possible outcome followed by an intense deep clean of the scene to ensure that the next drunken pedestrian passing through doesn't trip over a discarded washer and sue for millions for the pain caused to his stubbed toe.
heebeegeetee said:
OJ said:
Don't get me wrong, but its not like a couple of coppers could bounce a 40 tonne artic back onto its wheels?
No, but you could leave it there until it goes dark and quiet and then pick it up. Unless it's load is strewn all over the place of course...heebeegeetee said:
OJ said:
Don't get me wrong, but its not like a couple of coppers could bounce a 40 tonne artic back onto its wheels?
No, but you could leave it there until it goes dark and quiet and then pick it up. Unless it's load is strewn all over the place of course...The junction on the M3 has quite a sharp curve in it and isn't particularly wide. I'm willing to hazard a guess that it would have ended up right across the road
andyuk911 said:
There was one at J6(M25)the other day ... They put a green banner up, and then recovered it late at night ...
I saw that truck last week on its side on the roundabout - must have fallen off M25. Last night lorry had gone - but all it's pallets (no contents) were still piled up on roundabout. Really was quite odd when I saw that last week!Gassing Station | Speed, Plod & the Law | Top of Page | What's New | My Stuff