Builders...Concrete raft/base cost
Discussion
Jesus that's big, sure you've got your measurements right? I thought our new block built shed was huuuuge!
we've just poured a concrete base of 18ft x 22ft for which the ready mix was £600. We dug the foundations, put hardcore in and shuttered ourselves. It was approx 6cubic metres of readymix.
we've just poured a concrete base of 18ft x 22ft for which the ready mix was £600. We dug the foundations, put hardcore in and shuttered ourselves. It was approx 6cubic metres of readymix.
I've recently done my own garage base (13' x 24' x 6")
Approx costs:
Timber for shuttering £50
Steel mesh reinforcement £120
Type 1 £130
DPM £15
Readymix £590
Hire of pump (was a long run) £190
Hire of whacker £25
£1120
Before the pour makes sense to put in some services.
I ran hot and cold water feeds from the house in MDPE, armoured cable and put a 4" waste in so I can install a run of cheap kitchen units with a worktop and sink.
Approx costs:
Timber for shuttering £50
Steel mesh reinforcement £120
Type 1 £130
DPM £15
Readymix £590
Hire of pump (was a long run) £190
Hire of whacker £25
£1120
Before the pour makes sense to put in some services.
I ran hot and cold water feeds from the house in MDPE, armoured cable and put a 4" waste in so I can install a run of cheap kitchen units with a worktop and sink.