1m3 of concrete=kg?
Discussion
Roughly a 2 tonnes.
Edit to add:
http://www.google.co.uk/search?q=1+cubic+metre+of+...
Edit to add:
http://www.google.co.uk/search?q=1+cubic+metre+of+...
Edited by philthy on Tuesday 3rd February 10:32
2450 kg
It will vary depending upon aggregate size, amount of water and any other admixtures. Weight will be anywhere between 2200-2500, the british standard on temporary works suggests using 24kN/m3 for concrete.
Why is the weight so important?
It will vary depending upon aggregate size, amount of water and any other admixtures. Weight will be anywhere between 2200-2500, the british standard on temporary works suggests using 24kN/m3 for concrete.
Why is the weight so important?
Edited by ALawson on Tuesday 3rd February 10:34
because its to big, its 47.5 tonnes of material, which we cant store, cant get to the site without being a hgv driver.
Weeks work, and we have 3 big jobs all ready backed up we cant do, we just cant spare anyone to do it, and its to risky, for the job that wants doing, and how they want it done, its a bit, could work, or could go horribly wrong.




And of course with current economic climate, we would need about 50k upfront to even entertain it...47 tonnes of material, 1 week,3 guys we could sort of spare but not really. Without sounding to soft, I cant send 3 guys to shift 47 tonnes of material, and do rendering work on steps in a week, possibllity of serious injury occuring, which puts one of our guys out of work, and we cant afford that, more importantly its there safety
shame
Weeks work, and we have 3 big jobs all ready backed up we cant do, we just cant spare anyone to do it, and its to risky, for the job that wants doing, and how they want it done, its a bit, could work, or could go horribly wrong.




And of course with current economic climate, we would need about 50k upfront to even entertain it...47 tonnes of material, 1 week,3 guys we could sort of spare but not really. Without sounding to soft, I cant send 3 guys to shift 47 tonnes of material, and do rendering work on steps in a week, possibllity of serious injury occuring, which puts one of our guys out of work, and we cant afford that, more importantly its there safety
shame
pits said:
because its to big, its 47.5 tonnes of material, which we cant store, cant get to the site without being a hgv driver.
Weeks work, and we have 3 big jobs all ready backed up we cant do, we just cant spare anyone to do it, and its to risky, for the job that wants doing, and how they want it done, its a bit, could work, or could go horribly wrong.




And of course with current economic climate, we would need about 50k upfront to even entertain it...47 tonnes of material, 1 week,3 guys we could sort of spare but not really. Without sounding to soft, I cant send 3 guys to shift 47 tonnes of material, and do rendering work on steps in a week, possibllity of serious injury occuring, which puts one of our guys out of work, and we cant afford that, more importantly its there safety
shame
If you need 47tonnes of the stuff, why on earth would you use 25kg premix bags? That's more than 3 truckloads of readymix! Can you not use a pump to get readymixed onto the site?Weeks work, and we have 3 big jobs all ready backed up we cant do, we just cant spare anyone to do it, and its to risky, for the job that wants doing, and how they want it done, its a bit, could work, or could go horribly wrong.




And of course with current economic climate, we would need about 50k upfront to even entertain it...47 tonnes of material, 1 week,3 guys we could sort of spare but not really. Without sounding to soft, I cant send 3 guys to shift 47 tonnes of material, and do rendering work on steps in a week, possibllity of serious injury occuring, which puts one of our guys out of work, and we cant afford that, more importantly its there safety
shame
ed to add. Just noticed you're rendering with it. At 5m height of wall and 25mm thick that would be a building perimeter of nearly 160m. Are you sure you haven't got a decimal place wrong somewhere?
Edited by Tom_C76 on Tuesday 3rd February 11:52
pits said:
No unfortunatly we need to use this specific mix, which we can only get in 25kg bags for special resin floors 
Tried someone like this?
http://www.cemex.co.uk/gl/gl_sr.asp
We use some specialist concretes, they are 'made to measure'.