Hi all, new to PH and this is my first post - so be nice!
I am needing to replace my current roof and wanted to get an idea on what I will be looking at cost wise? It's a three bed terrace. The current roof is approx 20+ years old.
Has anyone recently replaced theirs or anyone in the trade who can give me a rough estimate?
Much appreciated.
I am needing to replace my current roof and wanted to get an idea on what I will be looking at cost wise? It's a three bed terrace. The current roof is approx 20+ years old.
Has anyone recently replaced theirs or anyone in the trade who can give me a rough estimate?
Much appreciated.
I did my roof myself, cost about 1200 quid in materials and for that I changed the tiles,battens,felt,ridge,gutters,downpipes and fascia boards and I also dropped the chimney 4 courses below roof level and built it back up. I did get quoted about 3 and half grand for a roofer to do it. I did the front half one saturday then had the scaffold moved and did the other half the following saturday.
jeebus said:
I did my roof myself, cost about 1200 quid in materials and for that I changed the tiles,battens,felt,ridge,gutters,downpipes and fascia boards and I also dropped the chimney 4 courses below roof level and built it back up. I did get quoted about 3 and half grand for a roofer to do it. I did the front half one saturday then had the scaffold moved and did the other half the following saturday.
You did that in two days? Blimey! Took me 5 to do the fascias and soffits!Have had two quotes of around the same (£3200-£3400) to replace the roof on my 3 bed semi in the midlands. IIRC the lower one number included a discount for doing the neighbours half of the semi at the same time.
VxDuncan said:
jeebus said:
I did my roof myself, cost about 1200 quid in materials and for that I changed the tiles,battens,felt,ridge,gutters,downpipes and fascia boards and I also dropped the chimney 4 courses below roof level and built it back up. I did get quoted about 3 and half grand for a roofer to do it. I did the front half one saturday then had the scaffold moved and did the other half the following saturday.
You did that in two days? Blimey! Took me 5 to do the fascias and soffits!Have had two quotes of around the same (£3200-£3400) to replace the roof on my 3 bed semi in the midlands. IIRC the lower one number included a discount for doing the neighbours half of the semi at the same time.
I started stripping the roof at 7-30 and was putting the new tiles on at 12 o clock which is the easy bit, it's the getting them up the scaffold that is a backbreaker

Edited by jeebus on Sunday 7th February 20:09