Discussion
Bought of Ebay a spare Griff 500 'Y' exhaust section with the aim of removing the cat (3 cats - largest in the 'Y' section with 2 others in manifolds).
However, getting the cat out seems a problem unless I cut and rewled the downpipe?
Can anyone offer me advice on how to remove the cat and the benefits of removing the largest of the 3 cats.
However, getting the cat out seems a problem unless I cut and rewled the downpipe?
Can anyone offer me advice on how to remove the cat and the benefits of removing the largest of the 3 cats.
I've just recently removed the pre cats on my Griff. One was loose in the pipe so I just managed to smash it along one side and pulled it out. The other one was intact, so I made a 'H' shaped cut on the bottom side of the manifold, gently rolled the two edges back to reveal the cat and then just squashed the cat down with a cold chisel and hammer until it was completely removed. Then welded manifold back togther. The whole process didn't take much longer than 20 mins. I would use the same process to remove the main cat, as the cats are a lot weaker at their sides than their ends, due to their honeycomb construction.
Hope this helps.
Hope this helps.
Been toying with the idea of a full decat meself since my precats 'fell' out.
Don't forget you will almost certainly require a different chip for the ecu (or a visit with Mark Adams)and a different tune resistor.
See www.pistonheads.com/gassing/topic.asp?t=80171 for more.
Don't forget you will almost certainly require a different chip for the ecu (or a visit with Mark Adams)and a different tune resistor.
See www.pistonheads.com/gassing/topic.asp?t=80171 for more.
IPAddis said:
I was also thinking of going down this route although a new stainless y-piece with no-cat from Tim Lamont at Act is only £235. Sounds like a bargain to me.
I've heard it's a bit tricky changing the y-pieces for the MOT though (I heard 7 hours!).
Ian A.
7 hours would be to do the manifolds. I would thing even an inexperienced DIY'er could change the Y piece in little over an hour.
Removeal and refitting with new gaskets of the offside manifold took me 1.5 hours. Allow an extra 1.5 for the nearside ( as you have to remove the silencer) = 4.5 hours for manifolds, plus .5 for the Y piece (of piss) so 5 hours for the whole job.
TVR Power wanted 20, cos they don't like doing it!
TVR Power wanted 20, cos they don't like doing it!
Gassing Station | Griffith | Top of Page | What's New | My Stuff



