I'm in the process of getting an extension underway and need to relocate the gas and electric meter positions.

I've just filled in the applications for this doing but need to get the new meter boxes in place.

I'm going to get these (Jewson stock them).

Electric


Gas


Bit of a newb question but I'm not sure what tool(s) would be best to use to cut out the hole in the brickwork. And what to seal it with afterwards.

I'm also reliably informed it won't need a lintel of any kind to support the hole, does that sound right?

Any tips?

Just to add I can only use the built-in boxes as they are going in a driveway so need to be out of the way.

miniman

25,058 posts

263 months

Tuesday 1st June 2010
quotequote all


Seriously, I presume (as mine does) the box sits back a fair way into the wall?

ss64ii

304 posts

219 months

Tuesday 1st June 2010
quotequote all
Are they going in the bew build extension?
If so build them in.
You will also need a cavity tray dpc to go over the lintol as well.
Make sure the hockey stick is in place before you build the box in, you'll have trouble getting it in afterwards.

Ferg

15,242 posts

258 months

Tuesday 1st June 2010
quotequote all
Please be aware that the gas box MUST NOT be drilled to fix it into the brickwork. The ONLY holes must be outside the outer leaf i.e. the in and out from the bottom OR via the spigot which must be used to make a hole to the inside of the property.

dave_s13

Original Poster:

13,816 posts

270 months

Tuesday 1st June 2010
quotequote all
Cheers.

I'm guessing one of these should do it

http://www.hss.com/g/7116/Cut-Off-Saw-350mm.html

or one of these (cheaper)

http://www.hss.com/g/7115/Cut-Off-Saw.html

Brickwork opening needs to be....370mm x 530mm x 150mm

dave_s13

Original Poster:

13,816 posts

270 months

Tuesday 1st June 2010
quotequote all
ss64ii said:
Are they going in the bew build extension?
If so build them in.
You will also need a cavity tray dpc to go over the lintol as well.
Make sure the hockey stick is in place before you build the box in, you'll have trouble getting it in afterwards.
No, in the existing brickwork.

Thanks for the tips.

dave_s13

Original Poster:

13,816 posts

270 months

Tuesday 1st June 2010
quotequote all
ss64ii said:
......
Make sure the hockey stick is in place before you build the box in, ....
For those of us that aren't sure what a hockey stick is, please explain..... smile

Just googled it. The conduit that protects the cable.

Just to be clear the hockey stick houses the cable from the meter to you consumer unit, right?

Edited by dave_s13 on Tuesday 1st June 20:32

Ferg

15,242 posts

258 months

Tuesday 1st June 2010
quotequote all
Piece of bent duct that runs down the wall and bends horizontally into the trench.

dave_s13

Original Poster:

13,816 posts

270 months

Tuesday 1st June 2010
quotequote all
Oh, hang on......

My incoming leccy supply is a bit odd in that it's clipped to the outside of house and runs horizontally at 1st floor level above where the new box will sit.

I was assuming they would T-off from there vertically down into the new box.

Do I still need a hockey stick?

Edited by dave_s13 on Tuesday 1st June 20:36