What did I see / hear? Train related.
What did I see / hear? Train related.
Author
Discussion

UncleRic

Original Poster:

937 posts

198 months

Sunday 18th July 2010
quotequote all
Very, very early this morning I was woken up by something happening on the train tracks out the back of my place. I've seen diggers, foliage and tree cutters and various other 'obvious' train track related goings on in the past but I had no idea what this particular machine was doing.

It was about the length of two 'standard' train carriages, yellow, loads of lights and very noisy. It would move slowly forward about 10ft, screech to a stop and then for the next 8 - 10 seconds all hell would break loose. Loads of noise (metallic banging) and massive vibrations. Then, it would move forward again and repeat the process.

Any ideas what was going on?

My inner child loved watching it wobble , my early morning adult head just wanted to go back to bed sleep.

dilbert

7,741 posts

261 months

Sunday 18th July 2010
quotequote all
Probably a track tamper.

It joggles the ballast around under the track, and realigns the track into straight lines or smooth curves.

tuffer

9,012 posts

297 months

Sunday 18th July 2010
quotequote all
It may be a ballast lifter (this is my name and I have no idea what they are really called). Basically it drives arms down under the sleepers and then vibrates them rigorously.......but I may be wrong.

Silent1

19,762 posts

265 months

Sunday 18th July 2010
quotequote all
Track tamper, aligns the track and vibrates the ballast back into place with more force than your OH's rabbit

working class

8,998 posts

217 months

Sunday 18th July 2010
quotequote all
I love saturday nights when I am on a big Engineering job, I could stand wathcing them for hours, truly brilliant machines but very dangerous to be around!






Edited by working class on Sunday 18th July 18:02

UncleRic

Original Poster:

937 posts

198 months

Sunday 18th July 2010
quotequote all
Cheers all thumbup

A quick look on the 'net and I'm pretty sure that's what it must've been. I guess I must have spent a good 20 minutes watching it from my (opened for a better listen / view) lounge window.

working class

8,998 posts

217 months

Sunday 18th July 2010
quotequote all
anonymous said:
[redacted]
Moving rail factory? Have you got a link to that? Never seen that one, ive watched the rail train drop off lengths upto 1/4 mile long and even longer straight into the 4ft, then when they switch rails, the road railers do all the work from the adjacent line.

ETA: I think you mean this from 4:30ish onwards?

http://www.youtube.com/watch?v=uvDdh7Hfwhw&fea...

Edited by working class on Sunday 18th July 18:10

UncleRic

Original Poster:

937 posts

198 months

Sunday 18th July 2010
quotequote all
http://www.youtube.com/watch?v=ORI8GCUB7hw&fea...

This is pretty similar noisewise. Guess I must have been mistaken about the stopping, maybe it just slowed. There was definatley screeching before the tampering (?).

UncleRic

Original Poster:

937 posts

198 months

Sunday 18th July 2010
quotequote all
Those in the know, is this sort of work in response to a problem with the tracks or more of a maintainence job done to a specific (yearly / 2 yearly?) schedule?

dilbert

7,741 posts

261 months

Sunday 18th July 2010
quotequote all
UncleRic said:
Those in the know, is this sort of work in response to a problem with the tracks or more of a maintainence job done to a specific (yearly / 2 yearly?) schedule?
I think it's probably a bit of both.

The worst problems are usually subsidence, and water. The former usually arises as a result of the latter.

Normally it's just wear and tear. You can see it if you get a straight bit of track near a station. Stand at the end of the platform, and look down the track. If you can see the rails wiggling around all over the place, then it needs tamping (or replacing). They should just be straight or smooth curving lines.

It gets worse, as it becomes worse. Eventually it wears the rolling stock. It feels awful in older stock, but newer stock is more immune, with gas suspension.

I'm not really in the know though!
smile

Edited by dilbert on Sunday 18th July 18:48

Rude Girl

6,937 posts

289 months

Sunday 18th July 2010
quotequote all
I think I might be described as being 'in the know' - it's certainly in my job description!!

Firstly, it sounds like it was either a Tamper or a Stoneblower. PM me with your location and the date, and I'll find out.

Secondly, either tamping or stoneblowing can be deployed either as routine maintenance, or in response to a track geometry issue (for instance to remove either an emergency or a temporary speed restriction imposed as a result of a track fault). In either case, the purpose is to either lift the track, or to move it laterally; neither machine can lower the track. In the case of tamping, the track and sleeper is lifted, and the tines vibrate until the ballast effectively behaves as a liquid, and the sleeper is left in a position either in accordance with a design or a position determined by the machine software. Stoneblowing injects new stone under the sleepers to achieve a change in track geometry.

Dilbert - not quite accurate. A change in track geometry is not always due to subsidence, although it is a problem, for instance on embankments in some geological conditions where dry periods in summer can be a real problem. Tamping or Stoneblowing cannot correct wet beds however, although they can sometimes be deployed to affect a temporary improvement in track geometry. If you don't dig out a wet bed, it will only be a temporary fix, and tamping does itself degrade ballast and shorten track life, so it's always an engineering balance.

If you want to see more, then Tampers utilised in the UK are built by either Plasser & Theurer, or Matisa. Stoneblowers are built by Harsco Rail. They all have pretty good websites. Or for the nerdy, then there are plenty of Plant Spotters' Websites.

working class

8,998 posts

217 months

Sunday 18th July 2010
quotequote all
Rude Girl said:
I think I might be described as being 'in the know' - it's certainly in my job description!!

Firstly, it sounds like it was either a Tamper or a Stoneblower. PM me with your location and the date, and I'll find out.

Secondly, either tamping or stoneblowing can be deployed either as routine maintenance, or in response to a track geometry issue (for instance to remove either an emergency or a temporary speed restriction imposed as a result of a track fault). In either case, the purpose is to either lift the track, or to move it laterally; neither machine can lower the track. In the case of tamping, the track and sleeper is lifted, and the tines vibrate until the ballast effectively behaves as a liquid, and the sleeper is left in a position either in accordance with a design or a position determined by the machine software. Stoneblowing injects new stone under the sleepers to achieve a change in track geometry.

Dilbert - not quite accurate. A change in track geometry is not always due to subsidence, although it is a problem, for instance on embankments in some geological conditions where dry periods in summer can be a real problem. Tamping or Stoneblowing cannot correct wet beds however, although they can sometimes be deployed to affect a temporary improvement in track geometry. If you don't dig out a wet bed, it will only be a temporary fix, and tamping does itself degrade ballast and shorten track life, so it's always an engineering balance.

If you want to see more, then Tampers utilised in the UK are built by either Plasser & Theurer, or Matisa. Stoneblowers are built by Harsco Rail. They all have pretty good websites. Or for the nerdy, then there are plenty of Plant Spotters' Websites.
Im guessig you're either a P-way or Renwals manager?

Rude Girl

6,937 posts

289 months

Sunday 18th July 2010
quotequote all
working class said:
Im guessig you're either a P-way or Renwals manager?
Nope wink

V8mate

45,899 posts

219 months

Sunday 18th July 2010
quotequote all
Rude Girl said:
working class said:
Im guessig you're either a P-way or Renwals manager?
Nope wink
Duh! It's obvious. You're a girl...ergo...you make the tea hehe

dilbert

7,741 posts

261 months

Sunday 18th July 2010
quotequote all
Rude Girl said:
Dilbert - not quite accurate. A change in track geometry is not always due to subsidence, although it is a problem, for instance on embankments in some geological conditions where dry periods in summer can be a real problem. Tamping or Stoneblowing cannot correct wet beds however, although they can sometimes be deployed to affect a temporary improvement in track geometry. If you don't dig out a wet bed, it will only be a temporary fix, and tamping does itself degrade ballast and shorten track life, so it's always an engineering balance.
I wouldn't disagree with that. It's just that the OP, asked if Tamping was a maintenance issue, or a fault fixing issue.

I was trying to suggest that subsidence and water were a fault, and that small misalignments will naturally occur as a result of wear and tear and require maintenance.

I don't think either of us got it quite right till just there!

The point I thought about but didn't bother with, is that not only does increased misalignment lead to increasing misalignment, but that also; tamping will only work so many times. You said that the tamping degrades the ballast, and that is pretty important.

In the end I guess there's no real alternative but to lift the track completely. I presume that the engineering balance, attempts to get the rail to wear out at the same time as the ballast.

Edited by dilbert on Sunday 18th July 19:29

Podie

46,649 posts

305 months

Sunday 18th July 2010
quotequote all
V8mate said:
Rude Girl said:
working class said:
Im guessig you're either a P-way or Renwals manager?
Nope wink
Duh! It's obvious. You're a girl...ergo...you make the tea hehe
hehe she makes a corking brew to be fair, but if they're paying that much for a tea lady, I suggest you get your missus to find a job there! wink

Mr Rude.

dudleybloke

20,553 posts

216 months

Sunday 18th July 2010
quotequote all
their showing track building on quest now.

working class

8,998 posts

217 months

Sunday 18th July 2010
quotequote all
Rude Girl said:
working class said:
Im guessig you're either a P-way or Renwals manager?
Nope wink
scratchchin


UncleRic

Original Poster:

937 posts

198 months

Sunday 18th July 2010
quotequote all
Now we're getting somewhere. After a lengthy trawl, I'm pretty sure that this was the company doing the work (I was thinking collac, collec so just kept googling..)

http://www.colasrail.co.uk/index.htm

So, I can narrow it down to one of these..

Plasser & Theurer 08-4x4/4S-RT Tamper
Plasser & Theurer 08-12/4x4C-RT Tamper
Plasser & Theurer 08-16/4x4C100-RT Tamper
Plasser & Theurer 08-16/32 U-RT Tamper
Matisa B41 UE Universal Tampers
Plasser & Theurer 08-275 S & C Tamper
Plasser & Theurer 09-32 Tamper

Edited by UncleRic on Sunday 18th July 19:44

Rude Girl

6,937 posts

289 months

Sunday 18th July 2010
quotequote all
I thought their Matisas were overseas at the moment (wouldn't swear to it though), and if it kept stopping, it wouldn't be an 09 - look at Tonker's link, the 09s don't stop.