A329(M) new average speed cameras coming out of Bracknell
A329(M) new average speed cameras coming out of Bracknell
Author
Discussion

Bahnstormer

Original Poster:

948 posts

275 months

Saturday 14th August 2010
quotequote all
....two yellow gantries have appeared, one opposite the Peacocks Farm pub (but on the A329M !), and the second just before the Wokingham sliproad. Each gantry has one camera pointing in each direction.

Not sure if they are permanent or if they just there for the roadworks.

F355GTS

3,870 posts

284 months

Saturday 14th August 2010
quotequote all
for the roadworks for the new roundabout that's being installed, guessing it'll be a 40 for a while

Z06George

2,519 posts

218 months

Saturday 14th August 2010
quotequote all
frown

anonymous-user

83 months

Saturday 14th August 2010
quotequote all
Maybe they could finish the fking roadworks on the M4/A404 first. Those cameras have been there for over 2 years!

Infact, I haven't been through there for 3 weeks. Are they done there?

Targarama

14,784 posts

312 months

Saturday 14th August 2010
quotequote all
Drove along there today and there was no reduced limit and the specs cameras were not aligned, so its not set up yet. Can't take them too long to make an entry/exit slip there though once they get started.

Targarama

14,784 posts

312 months

Saturday 14th August 2010
quotequote all
MSTRBKR said:
Maybe they could finish the fking roadworks on the M4/A404 first. Those cameras have been there for over 2 years!

Infact, I haven't been through there for 3 weeks. Are they done there?
Yes they are still there.

http://www.highways.gov.uk/roads/projects/16443.as...

Edited by Targarama on Saturday 14th August 21:25

ViperDave

5,775 posts

282 months

Saturday 14th August 2010
quotequote all
http://www.a329roadworks.co.uk/

its going to be a 50 limit and a big mess until feb, then just a mess after that.

Could be fun bracknell bound once finished with choosing the bypass lane or roundabout slalom,

TrOllie

4 posts

201 months

Saturday 14th August 2010
quotequote all
Thanks for the warning. I wonder when they will come into effect.

Targarama

14,784 posts

312 months

Saturday 14th August 2010
quotequote all
ViperDave said:
http://www.a329roadworks.co.uk/

its going to be a 50 limit and a big mess until feb, then just a mess after that.

Could be fun bracknell bound once finished with choosing the bypass lane or roundabout slalom,
Are they even going to touch the Bracknell bound lane? Surely there is no space for a sliproad. It looks to me just like an exit/entry slip for the Reading/M4 bound side of the A329M.

ViperDave

5,775 posts

282 months

Saturday 14th August 2010
quotequote all
Targarama said:
ViperDave said:
http://www.a329roadworks.co.uk/

its going to be a 50 limit and a big mess until feb, then just a mess after that.

Could be fun bracknell bound once finished with choosing the bypass lane or roundabout slalom,
Are they even going to touch the Bracknell bound lane? Surely there is no space for a sliproad. It looks to me just like an exit/entry slip for the Reading/M4 bound side of the A329M.
Left lane stays put and is a bypass lane, the right lane splits off and goes to the roundabout which will be built to the side of the existing road/across the reading bound lanes.

All on the link btw

Targarama

14,784 posts

312 months

Saturday 14th August 2010
quotequote all
ViperDave said:
Targarama said:
ViperDave said:
http://www.a329roadworks.co.uk/

its going to be a 50 limit and a big mess until feb, then just a mess after that.

Could be fun bracknell bound once finished with choosing the bypass lane or roundabout slalom,
Are they even going to touch the Bracknell bound lane? Surely there is no space for a sliproad. It looks to me just like an exit/entry slip for the Reading/M4 bound side of the A329M.
Left lane stays put and is a bypass lane, the right lane splits off and goes to the roundabout which will be built to the side of the existing road/across the reading bound lanes.

All on the link btw
Sorry, I just enlarged the image on the home page - now seen the link. Pity you won't be able to nail it around the bend any more :-(

ViperDave

5,775 posts

282 months

Saturday 14th August 2010
quotequote all
Targarama said:
ViperDave said:
Targarama said:
ViperDave said:
http://www.a329roadworks.co.uk/

its going to be a 50 limit and a big mess until feb, then just a mess after that.

Could be fun bracknell bound once finished with choosing the bypass lane or roundabout slalom,
Are they even going to touch the Bracknell bound lane? Surely there is no space for a sliproad. It looks to me just like an exit/entry slip for the Reading/M4 bound side of the A329M.
Left lane stays put and is a bypass lane, the right lane splits off and goes to the roundabout which will be built to the side of the existing road/across the reading bound lanes.

All on the link btw
Sorry, I just enlarged the image on the home page - now seen the link. Pity you won't be able to nail it around the bend any more :-(
here's the nearly finished product, it could be a fun roundabout i suppose, unless they put a permanent 50 on it or something daft.


Edited by ViperDave on Saturday 14th August 21:55

anonymous-user

83 months

Saturday 14th August 2010
quotequote all
80 metres diameter! driving

Laura375

1 posts

192 months

Wednesday 8th September 2010
quotequote all
I just got done for doing 60mph on this stretch of road so be careful!

bodhi

14,571 posts

258 months

Wednesday 8th September 2010
quotequote all
I find this a bit harsh. I mean doing people for wanting to leave Bracknell at maximum warp. Have the local scamera partnership ever BEEN there?

It's like a Talivan waiting just over the Swiss border in the Great Escape, waiting for Steve to make his break for freedom, just so he can be issued with a fpn for doing 57 in a 40 when he landed.