My Garage Build thread.....
Author
Discussion

Tris2016

Original Poster:

3 posts

175 months

Sunday 14th August 2016
quotequote all
Long time daily reader of these forums, but never had the time to actively post here.

Found myself laid up resting this afternoon on the sofa, reading through all of the many excellent build threads, and decided that it was about time to put my first ever post on pistonheads

So here's my Garage build thread !!. Some background - my dad was a general builder and i was brought up with a shovel in my hand. I realized that it wasn't something that i wanted to do for a living, but ive always either rebuilt / built my own houses as a side line, or rebuilt / built cars, flittering between the two over the years.

Brought the house we have now about 2 years ago. 1900 ish Victorian place that had been generally neglected over the past 25 years, with a previous single lady owner getting the house as part of her divorce settlement in the 80's. It had a lot of building work done to it in the 70's (from which the old garage dates), but really nothing much since then. Highlights have been finding the worlds biggest bee's nest in the loft, and finding a mini cellar under the floorboards in the hallway while running cables !.

Anyway, to the garage. The old garage was a single brick skin on a 3inch slab, which was slowly falling apart.



The idea was to expand it slightly to the boundary (8m deep, 7m wide, 50m2 floor space), and to create a spare room / office above with an en-suite. Budget is £30k ish, with myself doing the majority of the work. Something like this -



With planning / building control hurdles passed, the old garage came down 2nd week of July.



Then new fowl water drains run in. This was both for the toilet upstairs in the garage, and i also needed to move the main sewer for the house further away from the old kitchen extension in preparation for a future project.



We don't have storm drains here in the village, and the old soakaway was totally blocked. New SUDS and a big hole followed...





Engineer wanted 2m deep foundations with foam board to stop root heave (there's a few tree's in the area). Lost count how much soil was removed..



We then came across next door's drain which is not in the location it says it is on the plans (next door was built on land that used to belong to my house about 15 years ago). Unfortunately it just clips my foundations, which then required some improvisation / discussion with the building inspector...





You can just see in the photo above how the soakaway then got converted into a sunken trampoline for the kids !.

First time ive ever done a beam and block floor and can't say i am too impressed with it - no faster than the old way imho, and certainly no cheaper, but hay ho..



And bringing it more or less upto date, the final concrete got poured last week.



Just getting quotes for the roof too, which will hopefully look something like this -



To date ive spent £18k, which included all the planning fee's, so hopefully on track budget wise. Build wise, the plan is to get it finished for Christmas

Anyway hope this is of interest out there - will try and keep this updated as i go along smile

Cheers
Tris


Edited by Tris2016 on Sunday 14th August 19:10


Edited by Tris2016 on Sunday 14th August 19:26


Edited by Tris2016 on Sunday 14th August 19:43

roofer

5,136 posts

242 months

Sunday 14th August 2016
quotequote all
Bookmarked.

scottri

951 posts

213 months

Sunday 14th August 2016
quotequote all
roofer said:
Bookmarked.
Me too. Can we have bigger pics please? :-)

Wacky Racer

41,412 posts

278 months

Sunday 14th August 2016
quotequote all
Nice thread, any chance you can post larger pictures next time?...smile

Tris2016

Original Poster:

3 posts

175 months

Sunday 14th August 2016
quotequote all
Wacky Racer said:
Nice thread, any chance you can post larger pictures next time?...smile
Yeh sorry - ive just changed it from [thumbs] to [pic]'s.

smile

AHealey

32 posts

123 months

Sunday 14th August 2016
quotequote all

I love the positioning of the childrens slide..(picture 3)..
That's one way to get rid of them...!

Tris2016

Original Poster:

3 posts

175 months

Sunday 14th August 2016
quotequote all
Just been outside to take an upto date picture - under floor vents are now in and almost up to DPC level. The part of the garage that backs onto the overgrown field behind is going to be block/render, the part that faces the garden is going to be brick, with the gable in block render to match the house.



One of my 2yr old twins is also showing considerable interest in this building lark wink


sagarich

1,302 posts

180 months

Sunday 14th August 2016
quotequote all
Fantastic! Will follow with interest.