My renovation and "small" extension

My renovation and "small" extension

Author
Discussion

shambolic

Original Poster:

2,146 posts

169 months

Tuesday 18th February 2014
quotequote all
Glulam beams in below walkway and above hall



First roof trusses in. (the back ones will be Glulam and visible when finished).



Just two quick iPhone snaps when I came in from work. W busy so never spent much time!
Hopefully better stuff tomorrow as more roof work and Glulams in.

shambolic

Original Poster:

2,146 posts

169 months

Friday 21st February 2014
quotequote all
Roof structure going up with Glulam beams to back which will be partially exposed to match the front and walkway beams when finished.


shambolic

Original Poster:

2,146 posts

169 months

Friday 21st March 2014
quotequote all
Sorry not been on as progress a bit slow due to weather and builders and usual stuff!!
We have a roof of sorts! Slated next week. Stonemason coming tomorrow to start rebuilding internal stone walls.
Here's a couple of photos from today.











Will update next week after roof etc!!

shambolic

Original Poster:

2,146 posts

169 months

Saturday 29th March 2014
quotequote all
Stonemason almost finished the internal lounge to library wall. Just the pointing to be done.



shambolic

Original Poster:

2,146 posts

169 months

Tuesday 29th April 2014
quotequote all
Wood burning stove instal. Stovax Duplex glass on both sides 9kw with ducted hot air to higher level.
Granite frame being fitted after chimney wall built.
Gives you a wee idea.





Ps looks high but floor level still to come up with underfloor heating and screed.

shambolic

Original Poster:

2,146 posts

169 months

Thursday 1st May 2014
quotequote all
Roof not finished due to delay with windows! Still waiting on damp proof guys so we can get on with floor etc!!!


shambolic

Original Poster:

2,146 posts

169 months

Saturday 3rd May 2014
quotequote all
Windows and dpc next week so should hopefully make better progress.

shambolic

Original Poster:

2,146 posts

169 months

Sunday 16th November 2014
quotequote all
Sorry for no updates but had a few major problems with unsafe existing walls etc.
some progress since last time though.

We nearly have a kitchen.





Front door and windows.



Some more lounge shots most plastering done and wall has had its lime mortar done. Wood burning stove in and ufloor heating all done.








shambolic

Original Poster:

2,146 posts

169 months

Sunday 16th November 2014
quotequote all
Wrong order of photos but here's hall, kitchen and stairs coming out for new kitchen.





All out.





Kitchen in



Another front door shot.
Rest of the front is wooden panels to match door and Caithness stone. (Not done yet)

[URL=http://s675.photobucket.com/user/shambolical/media/9295407F-7063-4399-9109-BA1B3F553952.jpg.html][/URL
More internal shots from last couple of months.













Should be mostly finished by Christmas.



shambolic

Original Poster:

2,146 posts

169 months

Monday 17th November 2014
quotequote all
Start of my windows going in today


shambolic

Original Poster:

2,146 posts

169 months

Monday 1st December 2014
quotequote all
Kitchen worktops in today.





shambolic

Original Poster:

2,146 posts

169 months

Monday 1st December 2014
quotequote all
Other front windows.


shambolic

Original Poster:

2,146 posts

169 months

Sunday 7th December 2014
quotequote all
Seasoning wood burner with wee fires.

shambolic

Original Poster:

2,146 posts

169 months

Monday 8th December 2014
quotequote all
Funk said:
Must be fantastic to see it coming together after so long, It's going to be massive!
Thanks it is as it's been a long hard slog. Now starting to see the finish line 6 month over time.

shambolic

Original Poster:

2,146 posts

169 months

Thursday 18th December 2014
quotequote all
Flooring and lighting make such a difference!





shambolic

Original Poster:

2,146 posts

169 months

Friday 19th December 2014
quotequote all
Bath and sink now fitted in guest bedroom. (Wife thought it would be nice to have bath in the bedroom)



Radiator only temp until my Orange bespoke one comes😂

shambolic

Original Poster:

2,146 posts

169 months

Monday 22nd December 2014
quotequote all
Thanks everyone. Has been a slog but is taking shape.
Steels are being left on show and just painted hammerite grey.
The glass for balcony on walkway is coming in new year.

shambolic

Original Poster:

2,146 posts

169 months

Thursday 8th January 2015
quotequote all
Was meant to be June last year.
6-8 weeks to go in total.
Started in September 2013.

FAO bigbaddom the kitchen came from Gideon Robinson in Glasgow and the worktop is Corian

shambolic

Original Poster:

2,146 posts

169 months

Thursday 8th January 2015
quotequote all
Burwood said:
The nicest builds ive seen in some time. You have good taste. Well, I think so. Congrats
Thanks but I would say most of the credit goes to my wife and the Architects.
The design and now the actual house has been really true to the architects initial sketches and proposal that ourselves and he came up with.
His ideas and some of the small details of lines of site, windows lining up, natural light and flow of the house have all worked out fantastic.

shambolic

Original Poster:

2,146 posts

169 months

Saturday 28th March 2015
quotequote all
menguin said:
This looks fantastic. Must be finished now (famous last words)? Any updates?
Nearly finished!!















Long way from this in September 2013!!!