Second time refurbishment - 1930's house

Second time refurbishment - 1930's house

Author
Discussion

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
After moving from my old flat - https://www.pistonheads.com/gassing/topic.asp?h=0&... - last autumn I thought that it is about time to create another build/refurbishment thread to stop me making a new thread to ask a stupid question or source materials each week.

While not as glamorous as Harry's this thread should hopefully chronicle the initial refurbishment, the build of a few garden rooms (2-4 years out) and then a major extension/proper refurbishment in 6-10 years.

Why did we buy it?

Despite our space-efficient layout we had begun to outgrow our old 1.5 bed flat (575sqft) and wanted some outdoor space so begun to look around last summer.

The flat was put on the market and after 19 viewings in 3 days we had a number of offers. It then came down to looking for somewhere new in a very hot market. We wanted somewhere that was:

- Habitable - after doing the last refurb we didn't want to have to do a lot of work initially...how stupid we look now...
- Within 30 mins of parents (Lee/Orpington)
- Garage for the Lotus
- Near a station with good links to London Bridge/City for work
- Room to extend/improve in time
- Nice area (we were very specific in our search - although we would look at a number of areas (Bromley, Beckenham, Petts Wood, Orpington, West Wickham, Hayes, Sanderstead) it was often just a select number of roads in each place. We did briefly consider Kings Hill but ruled it out when realised the reality of the commute.

After initially focusing on Petts Wood East (Kingsway etc for those local) and being astounded by the bidding wars for houses which left the cost/resultant value of each house underwater on materials alone we realised it wasn't affordable and, quite frankly, overpriced considering there are few schools and although improving Petts Wood insn't the foodie heaven we'd ideally like. After a few weeks kissing frogs and me screening out 95% of rightmove/agent alerts before viewing we ended up finding this house and have grown to love the location.

We're at the end of a quiet close, a 15 min walk to the station the gets me to London Bridge in 15 mins, close enough to Croydon to get all the best restaurants on Deliveroo, 5 minutes to my golf club, near some good primary schools for the future and within a few minutes walk of some woods/park. When walking in, although the house was tired (same, now elderly, owner for 53 years) it had great "bones" - big hall, living rooms, high ceilings, room to extend on the side/back and a deceptively wide wedge plot. Although tired it looked like it had been well-cared for - there was government grant insulation everywhere, annual servicing stickers on the boiler etc. but did very obviously need a refurbishment to be properly liveable/brought to our tastes.

Thankfully after viewing on the first weekend our offer was accepted (without the offers-over craziness!) and the house was secured - we moved in at the end of the stamp duty transition, saving a little there in the process.

The house as we bought it:

Front


Hall


Living room (previous owner couldn't get upstairs so was sleeping here)


Dining room


Kitchen


Bathroom


Bedrooms
|https://thumbsnap.com/myzSAMni[/url]

|https://thumbsnap.com/zoWZoWyB[/url][url]

|https://thumbsnap.com/efdzPmch[/url][url]

|https://thumbsnap.com/H6GtNBjh[/url]

Garden


[url]

Floor plan so you can visualise the current layout:




Edited by kiethton on Monday 21st February 18:14

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
Thanks all - hopefully I'll get this up to where we are now by the end of today and can then start looking at all of the other upcoming works/plans/getting some advice from there

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
wolfracesonic said:
Like the bath and the wash bowl ,is a 70s themed bathroom suite on the cards? laugh The exterior’s not going to be covered in K rend and anthracite grey is it?frown It will be interesting to see things develop!
Definitely not on any account! haha - intention is modernise, with a very large modern extension at the rear but to be sympathetic to all others (similar design) around it

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
On moving in it soon became more obvious (deep-down I knew) that everything was tired and needed replacing asap.

Door/draw fronts were hanging off or missing in the kitchen, the windows are mix of single/secondary glazed and aluminium double glazing and are all shot, the carpets are both horrible but also threadbare, every isolation valve for all hot and could water systems were ceased and the textured wallpaper (more on this later) was hung everywhere, most likely to avoid getting a plasterer in in the 70's. Thankfully none of the many cracks look structural (well, none were found in the top-cost building survey) with the most major being a crack above a upper floor door in the hall - there is nothing above so its likely a broken/too short lintel.

After moving in my thoughts turned to getting the house liveable. Our stuff was dumped in the dining room and "scary room" (I'll come on to this later) for now and we're living from boxes where possible so we can shift things around easily. Although I'm trying to get the initial refurbishment done for c£10k I'm realistic and, especially if in a room that I don't plan to touch with the major refurbishment/extension, i'll spend the cash if worth it. However, looking at the scale of the house and the cash I have I know that I'll have to do most of this myself and source the best deals on materials wherever possible. Although I'd love to swap doors and windows now there is no point given it'd more than double my target spend but would also create issues trying to find identical matches for the extension when built.

After finally moving into the house in early October I got started.

We laid down our mattress on the floor of the smallest box bedroom and got started on the larger second bedroom, at the back of the house - intention being to keep that as a "safe" space when we'd finished there and sleep in that room for the time being.

Beyond busting a radiator connection all went to plan, the textured wallpaper (just 1 layer here thankfully!) was stripped, walls and numerous small plaster cracks made good (the whole house will be skimmed eventually, I can't justify the cost at the moment), wallpaper paste residue and filler sanded back and all walls/skirting's etc were washed down everywhere multiple times and decorating started. 2 coats of white over what was a darker yellow/orange than anticipated/bare cement board ceiling and the same again for colour - Dulux Goose Down. To keep things simple all bedrooms will end up having the same wall colour, and carpet - we'll differentiate with furnishings in time.

Before:



During:






And done (ish)



Only things that still bug me are a few random patches of where it looks damper than the rest of the wall on the paint, both on external walls/chimney void and exaggerated by condensation when the heating's off/cold nights.

You'll notice that when I say its done the floors are still the bare floorboards - my intention is to finish all of the upstairs rooms and hallway before putting down the carpet/underlay for 4 reasons - the delay builds me some more cash to afford carpets/furniture, I am still regularly pulling up floors and it would be helpful to access lighting in ceilings downstairs (watch this space), they'll be clean, if installed now they would be ruined with dust in no time, and also they'll all be the same throughout upstairs so makes sense to do them all together.

At the same time as decorating this room it soon became known that all of the radiators throughout the house were full of air, had ceased, imperial, bleed valves, stuck thermostats and were in a minging condition.

And as a result of all of this the house was freezing and the boiler kept cutting out. I pulled the floorboards, bought appropriately sized/BTU rad's, moved the tails and installed them across all soon to be habitable rooms (3 smaller bedrooms, hall and living room). The house was then warm(ish), we stopped waking up with condensation on walls/windows and my wife stopped complaining (as much) - result! - I'll do the remaining rads as we complete these rooms going forward.

There were a few hiccups along the way but after nailing 2 pipes I got there in the end, more hassle but a lot cheaper than hiring somebody (I got quoted £250 a rad labour inc sundries (so all in ex. TRV's/the rads themselves) to do each one!



Edited by kiethton on Monday 21st February 18:09

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
With our bed built and us now based in this bedroom overnight (top left of floor plan upstairs) our thoughts then turned to the other smaller bedrooms - again intention being to start work at the top and work our way down.

One of these two smaller rooms (top right of floor plan) has been identified as a temporary office for me when WFH - the awful living room light fitting (with 3/12 bulbs working), stained textured wallpaper, tired curtains and low sun directly behind me wasn't working for zoom meetings.

Similar process to the above saw the rooms stripped back, rads replaced, walls made as good as possible and decorated and completed in a few weekends - with work my hours are generally 7am-7pm with 2 or 3 days WFH so all work is done in the evenings/weekends/holiday days.

Managed to find a picture of the rooms done, my office now has my monitors and beelink set up and the box room was being used as a wallpaper pasting set-up (now clothes storage) as of a few weeks ago.





Versus the before:





The internal doors throughout are not to our tastes but, like the windows, the intention is to look at them when we're in a position to do the whole house.

Edited by kiethton on Monday 21st February 18:19

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
Next on the list was the upstairs bathroom and separate toilet.

With the en-suite still functional (albeit a saniflo) and master bedroom untouched I ripped out and stripped the paper in the upstairs toilet room - 2 layers of hard, painted textured wallpaper. Under the old vinyl floor tiles was some semi-rotten (urine-smelling) vinyl tiles. After this I was down to the pine floorboards and green painted, crumbling/blown plaster walls.



Although the refurbishment is likely to see this upstairs cloakroom go entirely in time, with no toilet (or appropriately sized waste pipe) in the main bathroom its needed for now. I made the walls/plaster as good as possible, filled in the big holes, sanded it back (took it down to solid blocks on the lower half) and left the lead pipe on the corner as it's only supplying the toilet - had I already done the bathroom piping in hindsight I would have changed it over to polypipe. There isn't a basin in this room which isn't ideal but the logistics of installing one (space/hot water supply) wasn't worth it unfortunately.

The came design - I sourced some new white(ish) tiles from Facebook marketplace paying £70 for 55 boxes (1sqm per box) from a builder as excess stock. Although there are a good few broken tiles it should be enough for both this toilet room, the downstairs cloakroom and the main bathroom. I sourced a cheap toilet/WC vanity (£120 new) and built some boxing to the right height, allowing for floor level changes and started tiling.





We found some nice, subtle but not old fashioned wallpaper in B&Q if all places (on another seasonal offer) and got my FIL to out it up - it came out ok!



I still need to grout the tiles, change the light switch/fitting, run a bead around the top/window frame and install the new radiator but that will all come in time. However, just in case I need to access the wiring in the ceiling below the floor (LVT) won't be going down for a little while. As I don't want to cut the flooring around the toilet I can't install that either. This is not ideal but no big issue as there is just the 2 of us and 2 other toilets in the house.

Edited by kiethton on Tuesday 22 February 14:26

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
rustyuk said:
Looking at the fittings I'd say you might want to hold off decorating until you get it re-wired.
Thanks, believe it or not the consumer board is from 2007 so not that bad - rest of the wiring looks to be ok also - as always I'm trying to limit the expense for now, although I know it will all be changed come the big works.

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
iphonedyou said:
It's funny how COVID has changed things. I see those three chairs set out like that in the back garden and think 'socially distanced hello'.

Enjoy the house OP!
Thanks, sad but I really do think that is what it was!

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
More demolition...

With the upstairs toilet done focus now turned to 3 other areas - firstly the bathroom.



Tiles were taken down in a day, over-filing a 1t hippo sack, however with the bath still connected via a very intricate splice of stainless steel and lead pipes, fed from a variety of locations, I didn't fancy messing it up and leaving ourselves without water, again. As a result I took stock and got a pro in to disconnect it all/run new pipes for this room. After that was done I set about the old bath with a sledge hammer and carried it downstairs in numerous (surprisingly heavy) pieces. This bath, the old rads and redundant lead/copper piping will be weighed-in in due course.

There was a strange boxing in the corner, protecting the small angle of the stairs - looking at it I could see potential intrusion was low, yet the boxing was huge. I took a big drill and small touch to take a look and after seeing what I expected smashed it up too





The bathroom now looks like this:



All connections are in place to go, however for the time being we still need to get under the floor so am holding off until the wiring for the hall lighting has been done (we're going for LED strips in modern coving for soft lights there). When that's all wired I'll be getting new P5 chipboard down in the bathroom and hall upstairs as the existing pine planks are past it.

We've sourced a new bath (1800x800) for £40 (somebody ordered one and it was too big so saved £200!) and will be rotating it, building the shower into the boxing on the opposite wall and allowing a proper bath screen to be installed. The basin will be staying in the same place but again, we sourced a new vanity unit (dark gloss grey) for £40 on eBay (£190 saving!) as "the doors don't open properly" - a little adjustment and it's good as new...result! We also found some feature tiles to go behind the bath, on clearance in Homebase - same size and everything! For £50 so trying to be as cost efficient as possible

Edited by kiethton on Monday 14th March 21:31

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
Last bits to take us to where we are now:

Hallway

Before I can get flooring down upstairs I knew that the lighting needs to be done (or at least wired) downstairs. As we liked our lighting set-up in the old flat but don't want the hassle of installing spotlights the intention is to install a modern style of coving, with LED lighting (upstairs and down) to provide the soft light at times we do not want main lights on. The intention is create a look which is a little like this (warm white, non-chav) to provide a half-light for night time toilet trips/soften ceilings as they're quite high.



We intend to replicate this in the living room/dining room too so that we don't need wall-lights and can settle in to watch TV/a film with some very dim background lighting.

As I looked at this I've currently got about 80% of the wallpaper in the hallway off and all of the coving (was plaster coving downstairs only). Although we like the Picture rail, with it covered in god knows how many layers of paint this will likely be removed in time. The other issue is that the removal of the plaster coving and historic leaks from above have left the perimeter edges of the old cement boards in a poor condition, with clear gaps through into the ceiling board and the bathroom above (now the boards are up). After we've run the new cables for the lighting my intention is to overboard the ceilings downstairs, move the pull-chord for the loft light upstairs (next to the hatch), strip the wood from the stairs/HWC cupboard and get a plasterer in for a quick skim (likely same needed in living/dining rooms too!)

As the hall was:



As it is now:

|https://thumbsnap.com/tiiwxGLh[/url]


Master bedroom

How it was:



The last remaining major room upstairs is the master bedroom. To give my wife something to work on as I fit bathrooms/run cables I've also stripped off all the wallpaper off the walls and windows in here - this (or different patterns was on every wall, often in multiple layers and painted liberally).



I've also smashed out the old wardrobes, taken off and capped the old radiator pipes (I'll fit a new one after its decorated), taken up the carpet and filled the worst holes. Of note I even had to take the trim pieces off around the sides of the window as they were so off-square it was jarring me

In doing so I couldn't believe that the previous owners had these two floor coverings together in the same room

It now stands like this



The last of the rubbish here will get carried down to the garage this evening. The black on the walls just looks to be harmless condensation from spending 50 years behind the cupboards on an internal wall - I even know the date the carpet was fitted as I found a newspaper to bulk up the (now collapsed) rubber underlay.

Last is the garden

The front of the house was dominated by a clump of confiers. Although they had already been chopped a little by the previous owner they blocked nearly all of the light (south).



A chainsaw (tiny Bosch battery powered jobby) was acquired and I set-about them. Now just 4 main trunks remain, too wide for my chainsaw. I'll get the pro's in to take these down (and a number of other very wide stumps left within the hedges/out back) come the spring.

Half way:



Now:



The back garden was overgrown, majorly, with each of the borders being 3-5m deep with various self-sown vegetation, including a huge number of Xmas trees, small oaks, roses and ivy everywhere. Similar happened here. Although the garden looked nice in the photos the reality was the opposite, dead apples all over the grass, well moss as it never saw light due to shade) and all the borders collapsing inward. Again our came the chainsaw and much devastation was had...and some inquisitive neighbours were met...





Click for video:


The biggest issues are now:

1) The ivy which is taking over everything, I've tried to save the main tree (which also needs a prune - one for the pro's)

|https://thumbsnap.com/FpLAFzLa[/url]

2) the quantum of waste - I've got a pile which is about 3m wide, 1.5-3m tall and snakes to about 20m in length of green chopped wood/bushes. I tried a fire but it didn't really work...



I'll try again in a week or 2, else I'll try hiring a commercial shredder/chipper which should do it over a weekend.

Current pressing jobs are to do a dump run - my garage is full so I'm borrowing a minibus this weekend - great as a van with all the seats removed - and then I'll be trying to wire as much as I can, starting with the hall so that the bathroom can be installed! The builder that helped with the pipes has a tiler subby and has said it'll be £600-700 labour to tile the bathroom (floor-ceiling)and another £100 to replicate what I've done in the cloakroom downstairs, I'm tempted to get the pro in for this one!




Edited by kiethton on Tuesday 22 February 14:35

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
TimmyMallett said:
That's a very tame fox!
Yes very! - kept on coming up to me, sitting around me as I was chopping - totally oblivious to the sound of the (battery) saw. I now just wish it would be quiet overnight...

The main thing that's taking my (thinking) time right now is the LED lighting to go into the coving. I'd like a strip which is able to cast a warm/neutral white light (having other colours could be a bonus e.g. Xmas) but not essential. I think a continuous strip would give the best output?

As each run will be long - I think 15-20m depending on room - from looking I think that need to power it from each end - as it is likely to loop around the full room in all but one application this should not be an issue. I would also like to control these lights from a standard light switch (so dimmable) and power them directly from the lighting circuit if possible (hall needs to be controlled by 2 switches but work together upstairs and down) - does anybody have any suggestions/recommendations for strips/drivers?

kiethton

Original Poster:

13,945 posts

182 months

Monday 21st February 2022
quotequote all
_Neal_ said:
Interesting thread, property looks like it has tons of potential both inside and out - looks like an excellent choice, and sure it'll be great once finished. Hallway and garden are stand-out features for me. Sorry if I missed it, but where did you end up moving to in the end?

In terms of discovering what needs doing it sounds like a similar sort of tale to when we moved in to our 1930s semi (Petts Wood, Kingsway etc - small world!) back in 2015. Same owners for a long time, some comedy carpet/avocado bathroom suite action, and we thought it didn't need TOO much doing. Obviously it turned out it needed every room replastering, new windows and a new kitchen, flooring throughout etc etc etc. Really nice to be able to make it your own though of course.

ETA ours also had the owners' beds in the main living room when we viewed it!
Thanks, small world!

We're over between Sanderstead and South Croydon, Croham Hurst and Lloyd Park

In a way it's a benefit, we would have ended up decorating everything anyway, might as well add value (hopefully) from doing so ourselves!

When I next get a moment I'll try and share the plans/hopefully get some ideas on near-term plans for the Living room, dining room and kitchen and then longer-term thoughts for the garden rooms and extension.


kiethton

Original Poster:

13,945 posts

182 months

Tuesday 22nd February 2022
quotequote all
Had an hour long gap between meetings this morning and always like to take an hour to step away from the computer so thought I'd address our minging, rotten shed, especially as I've got the minibus for a dump run this weekend.

All in all this took me 10 minutes, proving just how far it was gone...











I'll break it down into smaller parts to get around the side of the house at the weekend, or alternatively use it to get the fire going to try and burn out a stump/burn some of the chopped vegetation you can see behind it all


Edited by kiethton on Tuesday 22 February 16:07

kiethton

Original Poster:

13,945 posts

182 months

Tuesday 22nd February 2022
quotequote all
Before I get into the near-term plans for the downstairs rooms it's worth touching on the long-term hopes for the house.

As a (currently childless) couple in our early-mid 30's its a house that is far too big for us in its current form, potentially just right in a few years time but somewhere that can be expanded to suit our needs if we do desire.

Although the initial refurbishment, currently ongoing, will get it to a habitable (but not perfect) state and hopefully add some value, long term we're planning some garden rooms and a major extension which could be expanded to a roof conversion if we so desire.

As I said in my initial post, the intention, after we've paid off some debt relating to the current works and rebuilt some savings is to build 2 garden rooms. One would house an office (back left) to free up the bedroom that I'm currently in and the second a gym/store for tools/garden furniture etc. if I'm lucky another could go in the back right for a golf simulator, although this space is likely to just be for a scaffold pole golf net/mat for the time being.

We're helped by having a deceptively wide plot, the back fence line being nearly 40m across





The buildings would be designed in line with OD principals and with the future extension in mind. Both are small enough to avoid BC regulations, although I intend to build them myself, to a high quality using as much insulation as possible as there is a liklihood that we'd have to live in them for 6 months as and when the main extension is done and I'd be working from home in the day/evenings year round, for a day or 2 each week anyway. As I do the initial refurbishment work in the main house I intend to future-proof for this to make my life as easy as possible when the time comes.

Ultimately the area between this buildings and the current dining room (rear left of the house) would be a patio and outdoor kitchen/entertaining space - we'd fit a sex pond between the two buildings also.

Basic plan for this as follows (I plan to teach myself sketch up when I have some more free time!!!)





Style would be very modern, something along these lines, although likely anthracite framed glazing, oiled cedar cladding and a larger overhang to shade as glazing would be south facing



Sizes for each are still TBC but we'd be looking at 18-24sqm for the office and a longer thinner design for the gym/store of 15-20sqm (split 70/30 between gym and storage).

I'll hopefully have my non-mortgage debt cleared in 1.5-2.5 years and hope to save the £25-35k estimated cost of the materials (just buildings, not hot tub or patios etc) to build the rooms in another year or so, excluding any negative surprises! As I said, I intend to do this myself, roping in friends/family where necessary!

Next up the main extension plans...

kiethton

Original Poster:

13,945 posts

182 months

Tuesday 22nd February 2022
quotequote all
The main extension is the next thing to consider and may explain why I'm not going that far with the current refurb, designed to get us through the next 5-10 years at minimum cost and to make the house saleable if we did ever have to/want to move.

Current layout:



Although the main house works it gets rather weird in the kitchen and beyond to the early 70's extension, dubbed the "scary" room by my wife.

The current kitchen has a random column - the end of the original house - and a flat-roofed, poorly insulated area beyond. Beyond that there is a small passage which we use as a utility area with external doors in both ends which then extends to the main room. Here this is in all of its timber linteled, single skinned, uninsulated, single glazed, polystyrene ceiling tiled, rainwater leaking, community centre floored glory.









In addition the garage is a little too small for my liking (barely fits the lotus in!) and isn't in the best condition either. Looking at the other houses on the close (18 houses built to the same initial floor plan) there is a great precedent for side extensions, the existing one (or PD as it's about the same distance) for rear extensions and houses to the back of us and on the close have already gone up into the lofts. You can see our immediate neighbours, who have extended to the side (double story), rear and single story side along the boundary to both sides on the satellite here.



Our initial thoughts are not as dramatic as our neighbours but, having a wider plot, the ability to utilise more of the wasted area and open up the plot appeals. I appreciate this will not come cheap and we may well end up hitting the ceiling price of the road, currently c30% more than we paid for the house last year, but as our "forever" home (if we did it) we'd be fine with that - it's for us to live in, not a development.

We like having the separation that separate rooms gives but also get the benefits of open plan space and prefer fewer, larger bedrooms to more, smaller, ones. Please ignore the room labels/in-fills below - this is an old version and I CBA to hack around in paint trying to fix it- but a crudely mocked up floor plan of what we could do is below:





Downstairs cloakroom toilet and front living room would stay as they are. The living room would become more formal in use.

Stairs in the hallway would be opened up (currently the cupboard underneath is accessed externally) and a on-trend glass/backlit wine store would be built.

Dining room would stay as it was but change into an informal living room. We do not want to extend over the back of this room as we rather like the patio door/window details that are there now, want an outdoor space that would still feel "indoors" and being near 5m x 4m it's already big enough.

The kitchen would open into a large open plan kitchen (closest), dining area (toward the back left/doors) and snug TV/social space (tucked back right) with patio doors/bifolds into the previously discussed outdoor kitchen/entertaining space. The hope is to also get a log-burner in here, perhaps in the back- centre of the room to split out the dining/snug space to provide a bit of a barrier and to break-up what would be a very long -c10m long space.

The external separate garage would be demolished and a new one built into the house, 1.5 sized door, widening with the boundary as you move back to fit my bikes/motorbike and other junk I'm sure we'd accumulate. This would likely have to be set-back slightly for planning but with an existing passage on the other side of the house having this built right to the boundary would be a definite benefit.

We would then look to put a new utility area behind the kitchen/garage, accessed from both rooms - likely with another downstairs loo too.

Upstairs the current toilet would be taken out and become part of the upstairs hall. The current (macerator) en-suite would be taken out and increase the size of the master bedroom. The current bathroom would become the en-suite for this room, with a new door created and the current one to the hallway closed.

The current office (third biggest bedroom) would become a family bathroom as water/waste connections are already here and it would be positioned well for the two non-ensuite bedrooms.

Bedrooms 2 and 4 would stay as they are.

Taking our the wall at the top of the stairs (current toilet) would create an even larger, open hall while we should also be able to take-out the current water tank as we fit a new heating system (replacing our boiler which dates from 2001) although we may keep some form of storage for towels/linnen here.

The passage created by taking out the upstairs toilet (we could even split the stairs to provide one half flight going right to match the one going left and could then lead to a master bedroom suite - en-suite, dressing room and main bedroom area.

The roof of the house is original and was identified in our survey as needing replacement, although this is only due to its age. The loft is already well insulated and high, over 3m to ridge, with few internal supports leaving a relatively open space already - At this point, if we do chose, we could add another bedroom suite or 2 in the loft area (incorporating the extension too), with dormers/velux balcony windows to the rear. Stairs to this could run over the top of the current wind of the stairs (past the current bathroom door).

We would then be left with a c4k sqft (more inc garden rooms) house of 5/6 bedrooms of which 3/4 would be en-suite.

At the same time as this all windows, internal and external doors, central heating, electrics would be replaced, all rooms skimmed and the exterior re-rendered, keeping its kerbside visual relatively similar/in-keeping. Hope is for the extension to replicate a few of the design cues found on the garden rooms, visible only from the back. For this one it would be my aim to not lift a finger but know that adding 1.8-2.4k sqft is not going to be cheap.

Again this is still some time away and my thoughts are still fairly early/un-developed for this part so any commentary/criticism welcome


Edited by kiethton on Tuesday 22 February 15:03

kiethton

Original Poster:

13,945 posts

182 months

Tuesday 22nd February 2022
quotequote all
Greshamst said:
If you screenshot the photos on your phone, then upload them, they won’t load on a 90 degree piss wink
Thanks! Was wondering how to fix that - will try and re-do this afternoon

kiethton

Original Poster:

13,945 posts

182 months

Sunday 6th March 2022
quotequote all
Busy weekend, a lot of invisible but necessary work:

Upstairs toilet light fitted
Upstairs toilet door painted
Upstairs toilet grouted
Bathroom electric shower disconnected, taken out and water supply capped with a compression fitting in the loft
New socket boxes fitted, chased out and wires for new sockets run
Moved the loft light switch from the hall (pull-chord) to the loft
Removed an old gas pipe (old gas fire, disconnected decades ago)
Finished taking down all the remaining wallpaper upstairs

When taking cutting holes for sockets in the master bedroom bay window I noticed that there was no insulation and a big draught. As this is our main bedroom that wasn't really going to work with my Mrs - she'd likely be sleeping on that side and is a bit of a reptile when it comes to heat/moving air. Decision was made to strip-out the cement board and I found a bit of an issue in the void:







The wall must have been buzzing!!!

Around the socket that was there I found another bodge - the back box was in the void, supported by an old wifebeater, newspaper and held together with some leftover plaster.



On closer examination:



Needless to say all was made good and the materials to make good should be here for next weekend



Edited by kiethton on Sunday 6th March 20:22

kiethton

Original Poster:

13,945 posts

182 months

Tuesday 8th March 2022
quotequote all
I'm now thinking about the insulation on the timber wall of that bay window and trying to avoid any "building sweat" issues.

In the bay is slatted timber onto which the tiles on the front of the house are fixed - there is some air flowing through this (and now into the house). The studs of the bay are 100mm deep.

My plan was to fix 25mm batons onto the back edge of each stud, install 75mm foil covered PIR above them to flush with the internal and tape across all edges. Air can then flow on the "cold" side of the insulation, in that 25mm gap, to take away any condensation. Wall side would then be a 12mm sheet of ply (a rad will be hung on the wall and brackets are unlikely to align with studs) followed by some 9.5mm plasterboard.

Does this sound sensible? I know it may only be a limited benefit as the floor void (between ground and first floors) is not insulated so cold air may enter this space and seep-in that way - I can feel airflow there now

kiethton

Original Poster:

13,945 posts

182 months

Monday 14th March 2022
quotequote all
A little bit more done this weekend.

As I said last week, after finding no insulation behind the bay window in the upstairs bedroom and a lot of draughts - knowing the lizard-like qualities of my wife that had to be sorted.

Although the lower half was stripped last week it was playing on my mind to check the upper half...again, nothing there so the cement board was stripped off, revealing yet more wasp nests (one of which was particularly huge, 2 black sacks in total!) and we were ready to begin rebuilding.

Of not, the void, amongst the nests I also found a tool which looks like it was left there when the house was built in the 30's!



Then my thoughts turned to rebuilding. Some PIR was found from Facebook market place, cut to size and slotted into the gaps. Expanding foam was used to seal up as much as I could:



I then went to foil tape all of the joints to block as much at the draught as possible, until I ran out...

With me not wanting to run back to the shop, again, (job for an evening after work) I then decided to get the radiator installed in the toilet upstairs. A little work and was done, surprisingly quickly considering both tails had to be moved and the joist notched.



The floor was then ply-lined to give a solid surface for the LVT:



That then takes us to this evening upon which we got a delivery of supplies to keep me going for a few more weeks...



That is all trim pieces to provide a fix for a curtain rail/hide the imperfections in the bay until such time a proper new window is fitted, some batons to build the boxing/bath frame in the bathroom and...66 P5 chipboard sheets to re-do the floors in the bathroom, hallway (boards have been cut so many times they are warped, gappy and partially missing and the living room/dining room/hall so that we can insulate underfloor and properly block-off the many draughts which blow through the downstairs from the floorboard gaps.

kiethton

Original Poster:

13,945 posts

182 months

Tuesday 22nd March 2022
quotequote all
One step forward, two steps back...

A stinking hangover last weekend limited the progress on the house with just the upstairs toilet floor laid. Came out quite nicely...obviously still needs to be siliconed around the edges...



Now the two steps back...I managed to drink a little too much on Friday evening and 1) was sick all over the (newly decorated) bedroom wall at 1am; 2) managed to spoil coffee down the wall of the office room the next morning - although they were scrubbed both will need to be repainted :/