Discussion
Surely colour also affects the in-your-face factor ...
Green / Red / Yellow / Blue / While / Silver / Crayon ?
Maybe not in that order ??
In the in-your-face stakes .... how does a colourful Touring compare to a neutral be-winged GT3 ?
From an engineering perspective I can only say that the 991.2 carbon wing is a work of art .... and have you seen the price for a replacement ?
Green / Red / Yellow / Blue / While / Silver / Crayon ?
Maybe not in that order ??
In the in-your-face stakes .... how does a colourful Touring compare to a neutral be-winged GT3 ?
From an engineering perspective I can only say that the 991.2 carbon wing is a work of art .... and have you seen the price for a replacement ?
ChrisW. said:
Surely colour also affects the in-your-face factor ...
Green / Red / Yellow / Blue / While / Silver / Crayon ?
Maybe not in that order ??
In the in-your-face stakes .... how does a colourful Touring compare to a neutral be-winged GT3 ?
From an engineering perspective I can only say that the 991.2 carbon wing is a work of art .... and have you seen the price for a replacement ?
Go on. Green / Red / Yellow / Blue / While / Silver / Crayon ?
Maybe not in that order ??
In the in-your-face stakes .... how does a colourful Touring compare to a neutral be-winged GT3 ?
From an engineering perspective I can only say that the 991.2 carbon wing is a work of art .... and have you seen the price for a replacement ?
Mad Scientist said:
Mr Peeler: saw you post on rennlist about possible delays to GT3 production. If it makes you feel any better, mine has moved forwards 2 weeks currently! Fingers crossed.
Yes I’m very hopeful now mate I’ve been told by a good source that 1st batch cars will be unaffected so roll on next month ![woohoo](/inc/images/woohoo.gif)
Hi Peeler and GTSJoe. Can you tell me when your order locked? My order locked 30.04.21 and I was trying to get a better understanding of how long after lock before it went into production. Im expecting a June build and I suspect its similar production date as yours (however mine has to get to a port and go on a ship to the other side of the world so the Porsche system currently show's early Sept delivery...)
Macca993 said:
Hi Peeler and GTSJoe. Can you tell me when your order locked? My order locked 30.04.21 and I was trying to get a better understanding of how long after lock before it went into production. Im expecting a June build and I suspect its similar production date as yours (however mine has to get to a port and go on a ship to the other side of the world so the Porsche system currently show's early Sept delivery...)
Mine locked 19th April![](https://thumbsnap.com/sc/zLh9jSqX.jpg)
Thanks guys. Looks like it goes into production roughly four weeks after it locks and arrives at your OPC roughly four weeks after that.
So Im guessing mine will be manufactured first week of June. If mine were a UK order I could expect it first week of July at OPC.
Roughly speaking the time on water is around 45 days for NZ although at the moment that could well be 55-60 days. So I now see how they get the first week of September...mmmm...will have to try and stay patient!
So Im guessing mine will be manufactured first week of June. If mine were a UK order I could expect it first week of July at OPC.
Roughly speaking the time on water is around 45 days for NZ although at the moment that could well be 55-60 days. So I now see how they get the first week of September...mmmm...will have to try and stay patient!
Gassing Station | 911/Carrera GT | Top of Page | What's New | My Stuff