been at it today finished the new brake pipe work to the rear diff assembly plus fitted all the new 7840 fuel hose to the refurbed tanks and got the diff assembly installed into the car so a big lump back in ,progress at last.

john





Engineer1949

Original Poster:

1,423 posts

145 months

Tuesday 31st December 2013
quotequote all
good day yesterday got the drive shafts fitted to the diff also dry fitted the new rose jointed bottom stay bar all looks good,then drilled the new fixing holes for the spherical bearings to replace the rubber bush at the forward end of the trailing arm, then cleaned up the trailing arms and got them painted new wheel bearings fitted with new seals got to source one new circlip then they will be all complete, made up the new 20mm shafts to go through the new spherical bearing the bearings are actually 25mm so got to make a bush for the centres but the housing on the 20mm bearing didn't look as robust as 25mm hence the choice, then turned my attention to the controls i took out the steering column as that is being replaced with electric power steering unit similar to the unit i fitted in the chim then took out the brake and clutch master cylinders for overhaul also make the paint job in the engine bay easier with everything removed, can't wait to get back at it.

john




























Engineer1949

Original Poster:

1,423 posts

145 months

Tuesday 31st December 2013
quotequote all
Probably wont be done for april but you never know yes full respray interior will be cleaned up as basically its good drivers seat needs some attention and new carpets but the next big job is the all new fully adjustable front suspension

John

Engineer1949

Original Poster:

1,423 posts

145 months

Tuesday 31st December 2013
quotequote all
Ok wedg1e but i want to retain it for the moment to assist with the new wiring will help to track down what the wires do but its yours for a couple of beers.

John

Engineer1949

Original Poster:

1,423 posts

145 months

Thursday 2nd January 2014
quotequote all
They all have high strength retainer shold be no problem reason is i cant source any a4 nylocs must be available but couldnt source them locally.

John

Engineer1949

Original Poster:

1,423 posts

145 months

Friday 3rd January 2014
quotequote all
another milestone today got the offside rear suspension all built up, i fabricated the top rails for the coil over shocks which once i have the adjustable shocks will give me infinite ride and height adjustment plus the ability to experiment with the spring rates quite like the idea of a much more upright shock with lower spring rate which give a much better shock travel to wheel travel ratio more the way later cars are going, still early days yet a bit more welding to finally fit the shock rails then paint and start all over again on the nearside.
there are also a couple of pics of the lower wishbone i have fabricated for the front suspension gives easy and fairly extensive camber adjustment needs the shock mount making and welding in place plus the bracket for the tie rod but pleased so far.
ignore the crow st welding migs gone tits up going to stick weld them tomorrow after some serious grinding but at least they are in place.

john














Engineer1949

Original Poster:

1,423 posts

145 months

Sunday 23rd February 2014
quotequote all
its been to long since i had a chance to get any more work done on the wedge what with the new workshop and my new to me military land rover, but thats all done now apart from getting the lathe and mill in place and wired up, marvellous stuff this retirement, but i had a good session and got the nearside suspension all fitted in welded and painted the new kemppi mig is a joy to use can't wait to get stuck in the fronts, also been doing some work to the new electric power steering i have worked out how to fit it etc. just need to implement the ideas couple of pics of work to date.

john






Engineer1949

Original Poster:

1,423 posts

145 months

Sunday 6th April 2014
quotequote all
this build is sooooo slow but got a bit more done friday front suspension is now a reality couple of mods to get it perfect but am happy with the result fully adjustable no stripping down required to adjust plus lighter and far more tuneable shocks springs etc. etc. the shock on there at the moment is an old chim bilstein will be having gas gold pros probably as have fitted a couple of sets recently not least to my chim and they seem o.k. for fast road.


john









Edited by Engineer1949 on Sunday 6th April 20:35

Engineer1949

Original Poster:

1,423 posts

145 months

Sunday 10th August 2014
quotequote all
this must be the longest rebuild i have done but just so much customer work, but have now set aside time to get on with my wedge and nicks cerebra want them both finished for next season or i`ll be to old, i have finished all the parts for the front suspension and got them all painted ready to install i am going to get the front end of the chassis painted this week so i can get all the front suspension on to have a rolling chassis then get it over to the paint shop to sort the body out whilst rebuilding the engine. some pics below of the front suspension.

Untitled by hmstvr, on Flickr

g]https://farm6.staticflickr.com/5554/14871642464_682465417b_b.jpg[/img][/url] Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Engineer1949

Original Poster:

1,423 posts

145 months

Thursday 14th August 2014
quotequote all
big push yesterday and today repaired all the stress cracks caused by the front body mountings parting company, got the front half of the chassis and the engine bay all ready for paint off to the rollcentre tomorrow for the cerby roll cage but will be getting some etch primer on in the afternoon hopefully.

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Engineer1949

Original Poster:

1,423 posts

145 months

Friday 15th August 2014
quotequote all
as promised managed to get the engine bay and front half of the chassis etch primed and undercoated looking good colour on wednesday.

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Engineer1949

Original Poster:

1,423 posts

145 months

Monday 18th August 2014
quotequote all
been at it again today got the engine and gearbox pressure washed and the engine stripped, it will need a new camshaft and followers, crank regrind, valves lapped in but bores are surprisingly good so rering them after honing all should be good, few pics below of the strip down plus a couple of closeups of the worn cam and followers

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

DSCN1041 by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Edited by Engineer1949 on Monday 18th August 20:52

Engineer1949

Original Poster:

1,423 posts

145 months

Friday 22nd August 2014
quotequote all
got the chassis and under the car all finished just the colour to do in the engine bay then get it back to a rolling chassis body with all the new front suspension.

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr



Engineer1949

Original Poster:

1,423 posts

145 months

Friday 22nd August 2014
quotequote all
another milestone today got the colour in the engine bay very pleased with the look start the suspension build monday.

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr

Untitled by hmstvr, on Flickr


Engineer1949

Original Poster:

1,423 posts

145 months

Saturday 23rd August 2014
quotequote all
Not going to be much next week working down in suffolk had my injections and got my visa

John

Engineer1949

Original Poster:

1,423 posts

145 months

Sunday 24th August 2014
quotequote all
Yes allways a little left over but i loved nicks chim so much decided to go the same colour scheme they should look good when they get together

John

Engineer1949

Original Poster:

1,423 posts

145 months

Sunday 24th August 2014
quotequote all
Yes allways a little left over but i loved nicks chim so much decided to go the same colour scheme they should look good when they get together

John

Engineer1949

Original Poster:

1,423 posts

145 months

Monday 25th August 2014
quotequote all
Rewire to the engine bay is on the cards as to the engine going to clean up the heads bullet the valve guides etc. plus a slightly hotter cam than the original havent decided what to use yet.


John

Engineer1949

Original Poster:

1,423 posts

145 months

Monday 25th August 2014
quotequote all
Rewire to the engine bay is on the cards as to the engine going to clean up the heads bullet the valve guides etc. plus a slightly hotter cam than the original havent decided what to use yet.


John

Engineer1949

Original Poster:

1,423 posts

145 months

Monday 25th August 2014
quotequote all
been busy today lousy weather so got on with the cars, made a new sc belt adjuster wheel for nicks chim as belt sizes has always been an issue got a handle on it now,and more or less fitted my new front suspension to the wedge all looks to actually fit as intended bit of a surprise there some pics follow.