Post engine rebuild / MOT advice

Post engine rebuild / MOT advice

Author
Discussion

Samjeev

Original Poster:

725 posts

122 months

Tuesday 29th November 2016
quotequote all
Looking for a little advice/ideas about a little potential conundrum:

Recently DIY Rebuilt an engine which took a number of months however the car's MOT expired 3 months ago. The engine will need to be Run in & Remapped preferably before the MOT as previously the car has always had issues passing the emissions testing with the 200 cell cat fitted, this has now been swapped out for removable 400 cell cat section however it would still be preferable to properly run in the engine before the nuts are revved off it for the emissions test.

Ideas on a postcard

HustleRussell

24,733 posts

161 months

Tuesday 29th November 2016
quotequote all
I don't think they'll rev the nuts off it for the emissions test- isn't it just fast idle ~2,000RPM?

Jimmyarm

1,962 posts

179 months

Tuesday 29th November 2016
quotequote all
between 2500 and 3000 (unless it fails the first fast idle then a range is given based on the engine).


Mr2Mike

20,143 posts

256 months

Tuesday 29th November 2016
quotequote all
Jimmyarm said:
between 2500 and 3000 (unless it fails the first fast idle then a range is given based on the engine).
Exactly, a complete non-issue.

M32Guy

62 posts

90 months

Wednesday 30th November 2016
quotequote all
You allowed to drive to and from a pre booked MOT as long as you go straight to and from the MOT station. You don't need tax or a current MOT but it still must be insured and roadworthy