Griff 500 nut and bolt rebuild

Griff 500 nut and bolt rebuild

Author
Discussion

eff eff

754 posts

204 months

Wednesday 4th September 2019
quotequote all

whistle

Olly-B

Original Poster:

143 posts

246 months

Wednesday 4th September 2019
quotequote all
eff eff said:
whistle
wink

Olly-B

Original Poster:

143 posts

246 months

Monday 9th March 2020
quotequote all
ou sont les biscuits said:
I had my Chimaera rebuilt to 'factory' spec (at Central) last year. I did however have the 14CUX removed and an MBE system fitted by Powers. There were a couple of reasons for that. One was driveability. No more shunting at low revs - when warm the car will pull from 700 - 800 revs in 5th without protest. The other reason was the poor quality of spares for the original ignition system. That is obviously no longer an issue, and Powers fit a new engine loom as part of the upgrade, which takes the worry out of 20 year old wiring problems. Coil packs? Hidden away behind the plenum. Unseen! Lack of a distributor? Again you don't notice it. There's a bung fitted where it was that looks factory. I also have a shiny new 120A Denso alternator to fit, when I CBA to fit a 120A main fuse.

I got rid of the leven stalks too, but left the handbrake sleeve, as it matches the gear lever knob.

Tidy engine bay photo. Yes, I know the 400 badges aren't original - I will sort that before the summer.




Edited by ou sont les biscuits on Wednesday 6th March 12:07
Nearly there,

A Pic from last week. Nice black and silver engine bay. In a couple of weeks she'll be home. Just some last wee bits and a the final Mapping.

Oliver