400se restoration part 2

400se restoration part 2

Author
Discussion

barrington

Original Poster:

1,316 posts

232 months

Saturday 31st December 2011
quotequote all
still trying to get the engine back in nearly there got a bit done over the holiday back problem holding me up at the moment hopefully will get get this sorted and can realy steam in .happy new year

barrington

Original Poster:

1,316 posts

232 months

Saturday 31st December 2011
quotequote all
thanks but for the gas my wife thinks ive got too much at the moment

barrington

Original Poster:

1,316 posts

232 months

Sunday 22nd January 2012
quotequote all
more work done today just got to remove the old loom tape and replace it during the week also fit the new slave cylinder .got to take the new clutch release arm into work to weld a plate on the back to beef it up as the original one the push rod had made a hole in it i now this is a weak point better safe than sorry also got my son to put the gearbox back in for me



Edited by barrington on Sunday 22 January 20:03

barrington

Original Poster:

1,316 posts

232 months

Monday 23rd January 2012
quotequote all
im fitting the engine on its own as i dont have a hoist but do have a bigger beam in the roof of the garage and block and tackle i have fitted them both ways but find it easy this way the silver on the chassis is heat sheild got to have some bling cheers dave

Edited by barrington on Monday 23 January 20:07

barrington

Original Poster:

1,316 posts

232 months

Monday 23rd January 2012
quotequote all
moded the clutch release arm so will try and get the engine in soon but work comes first at the moment

barrington

Original Poster:

1,316 posts

232 months

Monday 23rd January 2012
quotequote all

barrington

Original Poster:

1,316 posts

232 months

Monday 23rd January 2012
quotequote all
hi rob my car has the metal sleeve on the release bearing so hopefully with the new moded arm will be as light as yours the old arm was stuck on the pin in the bellhousing and was split in a lot of places cheers dave

barrington

Original Poster:

1,316 posts

232 months

Saturday 28th January 2012
quotequote all
good day today removed all the old loom tape and replaced with new the refitted engine with new clutch and manifolds just got to fit engine mounts starter motor power steering pipes ect

barrington

Original Poster:

1,316 posts

232 months

Saturday 28th January 2012
quotequote all
pistolar said:
Keep looking for faults:
Copper brake pipes not neat enough
Power steering pump cap looks knackered
Expansion tank needs replacing

Otherwise not bad :P
ill better come round and have a look in your stores for better ones or take them off that old banger in the drive

barrington

Original Poster:

1,316 posts

232 months

Saturday 28th January 2012
quotequote all
cheers mark just got to sort out the bits that are missing

barrington

Original Poster:

1,316 posts

232 months

Sunday 29th January 2012
quotequote all
ill do my best to to do better might get to bbwf if i get can get it ready

barrington

Original Poster:

1,316 posts

232 months

Sunday 29th January 2012
quotequote all
ill have a go it may be in primer and no interia but ill have a go

barrington

Original Poster:

1,316 posts

232 months

Sunday 12th February 2012
quotequote all
The Hatter said:
Looks amazing Dave, must come and see it sometime!
welcome anytime

barrington

Original Poster:

1,316 posts

232 months

Sunday 12th February 2012
quotequote all
a replacement header tank fitted thanks to dave (superwedge) he had a nice white one in his garage

Edited by barrington on Sunday 12th February 15:20

barrington

Original Poster:

1,316 posts

232 months

Monday 13th February 2012
quotequote all
im only down the road

barrington

Original Poster:

1,316 posts

232 months

Tuesday 14th February 2012
quotequote all
cheers chaps only taken 3 years so far all down to time and budget

barrington

Original Poster:

1,316 posts

232 months

Wednesday 15th February 2012
quotequote all
the hole car will be repainted the same colour as the engine bay

Edited by barrington on Thursday 16th February 18:41

barrington

Original Poster:

1,316 posts

232 months

Tuesday 12th June 2012
quotequote all
been a couple of months due to work and back problem but now have brakes and clutch sorted exhaust box on but need to adjust it with the universal tool (big f*****g hammer) before i can fit rear pipe then back on its wheels and sort out the cooling system

barrington

Original Poster:

1,316 posts

232 months

Saturday 25th August 2012
quotequote all
fitted new rad and fan now just got to work out water pipe runs as a lot of the pipe work was not fitted when i got the car can i have some pics of 400se engine bays from you chaps to help cheers dave

barrington

Original Poster:

1,316 posts

232 months

Saturday 25th August 2012
quotequote all
cheers ian that helps