Meadows Roundabout Improvements.
Discussion
So, apparently, the Meadows Roundabout is to be reconfigured, it has been talked about for ages, but I have yet to see any concrete plans, and considering the chaos that I am sure the 21 months of roadworks will cause, starting in two and a half months, I had to dig around to find the attached.
http://www.enterprisem3.org.uk/uploads/140bbca5602...
Anyone else aware of this?
It would appear that part of the plan involves making the A30 bypass the roundabout, which is no bad thing, and I have also heard that the road which heads onto the roundabout, running between the petrol station and Next is to close.
Anyone else know anything more?
http://www.enterprisem3.org.uk/uploads/140bbca5602...
Anyone else aware of this?
It would appear that part of the plan involves making the A30 bypass the roundabout, which is no bad thing, and I have also heard that the road which heads onto the roundabout, running between the petrol station and Next is to close.
Anyone else know anything more?
Frimley111R said:
21 months - fking pisstake! It's one large roundabout.
I actually had a conversation with a lady a couple of weeks ago on one of the goverment helplines. I called to the number on the signs by the side of the road to find out when the roadworks at the a329(m) / M4 would finish.She basically said that everything takes so much longer in this country because of "elf and safetly". A project in France, would generally be between 25 and 50% quicker.
It would seem they are delayed:
Just receieved this:
"Thank you for your enquiry requesting an update on the major roadworks at the junction between the A331 and A30, also known as the Meadows Gyratory. I am afraid to say that there have been a number of delays that have pushed the scheme back.
A report about the progress of both major schemes within Camberley is being presented to the Surrey Heath Local Area Committee at the upcoming meeting. A copy of this report can be found here. The report should be able to answer the majority of your questions.
I am sorry for the delay in responding, but I trust that the information is of use. "
http://mycouncil.surreycc.gov.uk/documents/s26449/...
What amused me most with the response, was the URL in his letter, which is below, the url above is ammended
https://boardgamegeek.com/thread/938054/building-i... Camberley TC petition response FINAL.pdf
Show's what gets done in council offices
Just receieved this:
"Thank you for your enquiry requesting an update on the major roadworks at the junction between the A331 and A30, also known as the Meadows Gyratory. I am afraid to say that there have been a number of delays that have pushed the scheme back.
A report about the progress of both major schemes within Camberley is being presented to the Surrey Heath Local Area Committee at the upcoming meeting. A copy of this report can be found here. The report should be able to answer the majority of your questions.
I am sorry for the delay in responding, but I trust that the information is of use. "
http://mycouncil.surreycc.gov.uk/documents/s26449/...
What amused me most with the response, was the URL in his letter, which is below, the url above is ammended
https://boardgamegeek.com/thread/938054/building-i... Camberley TC petition response FINAL.pdf
Show's what gets done in council offices