Oversized, slow moving load 17-19 Aug, to Weybridge
Discussion
Just seen this, will I guess will have some traffic fallout, hopefully minimum due to the times of travel, but will take up 2 lanes and travel at 12 mph on the M25 for a number of hours.
https://www.getsurrey.co.uk/news/surrey-news/m25-t...
https://www.eagleradio.co.uk/news/local-news/26577...
https://www.getsurrey.co.uk/news/surrey-news/m25-t...
https://www.eagleradio.co.uk/news/local-news/26577...
Edited by Trevatanus on Tuesday 14th August 15:52
Twas quite a beast. Was too late to catch it on the move, but found it in the end.
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Gassing Station | Thames Valley & Surrey | Top of Page | What's New | My Stuff