TVR Car Club Cadwell Trackday - 18 May 2023
Discussion
https://www.tvr-car-club.co.uk/shop.html#!/Cadwell...
Open and taking bookings.
I'm booked on already.
Separating the Cadwell day out of the Donington thread.
Its going to be a
Open and taking bookings.
I'm booked on already.
Separating the Cadwell day out of the Donington thread.
Its going to be a
Edited by mk1fan on Thursday 15th December 14:06
Time is moving us closer to the day.
I now have an essential site meeting on the Wednesday morning that I said I have to leave at noon on the dot
Sorted out my dash pod - new fixing screws for the screen and frame, dry joints on the leds fixed.
My new tank plate is being modified but now struggling to get some PTFE coated cables. UK suppliers seem completely incapable or unwilling to deal with a small order (over a week so far with two suppliers waiting for a price including me calling them three times). Ordered some off evilbay from China but won't be here until after Cadwell.
Replacement driveshaft and CV's ready to be swapped out.
Need to fix and fit the battery cover.
After that, and depending on the weather, swap the boots to the 16-inch spiders with TD tyres.
Parental units coming over tomorrow so should get driveshaft and battery cover done with me pops.
I now have an essential site meeting on the Wednesday morning that I said I have to leave at noon on the dot
Sorted out my dash pod - new fixing screws for the screen and frame, dry joints on the leds fixed.
My new tank plate is being modified but now struggling to get some PTFE coated cables. UK suppliers seem completely incapable or unwilling to deal with a small order (over a week so far with two suppliers waiting for a price including me calling them three times). Ordered some off evilbay from China but won't be here until after Cadwell.
Replacement driveshaft and CV's ready to be swapped out.
Need to fix and fit the battery cover.
After that, and depending on the weather, swap the boots to the 16-inch spiders with TD tyres.
Parental units coming over tomorrow so should get driveshaft and battery cover done with me pops.
Just got the battery cover - apaulinging repaired by me - to fit. I hope to get the TD wheels checked for balance tomorrow. If the weather forecast is dry(ish) I'll swap them on on Tuesday and fit the battery cover at the same time.
Then just need to brim the tank, fuel containers, tools, pack the car and drive to the hotel.
Then just need to brim the tank, fuel containers, tools, pack the car and drive to the hotel.
Gassing Station | TVR Events & Meetings | Top of Page | What's New | My Stuff