There is a 1.8 x 4.3 m single story flat roofed utility room stuck on the end of a larger kitchen extension also flat roofed which were both built pre 1999

The utility is only single bricked and starting to slip into small brook which runs down length of outer wall

Can I just demolish the utility and rebuild to current building regs specs ? Or would it need planning permission ?

And if it does and I dont apply for it what is the recourse ?

Thanks for your counsel

Nice But Dim

Original Poster:

462 posts

208 months

Sunday 11th September 2016
quotequote all
Thank you all for your comments

Both the kitchen and utiliy extension were done under formal palnning permission not a permissabke development pre- 1999

The house has already been expended to its max cf. its original curtilage

I woukd have thought that if the utility was rebuilt to the same plan and footprint then there should in theory be no problem in gaining formal permission for the work. What am I missing ?