I've got it back!!

I've got it back!!

Author
Discussion

richa

Original Poster:

534 posts

285 months

Monday 14th April 2003
quotequote all
After two long years, I've got my 390 back.

The list of work that has been carried out follows (sorry, it goes on a bit!):-

Remove Body.
Strip to bare chassis + shot blast.
Replace outriggers + attend to other areas of corrosion and cracked welds.
Zinc paint and powder coat chassis and all suspension components.
Replace all bushes, wheel bearings, all U/J's.
Replace engine, gearbox and diff mountings.
Rebuild all brake calipers.
Replace discs + pads (drilled & grooved disks + green stuff pads).
Replace all fuel and brake pipes for stainless steel braided.
Replace shocks and springs (AVO).
Other items include fuel pump, fuel filter, swirl pot, steering rack mounts, ball joints, trailing arms, drive shaft nuts, battery, exhaust.

Basically, it's a new car underneath. All nuts and bolts are new, and it drives brilliantly (although a bit hard at the moment).

If I've forgotten anything, I'll add it later!!

Rich.

stainless_steve

6,031 posts

259 months

Monday 14th April 2003
quotequote all
sounds great Rich, all you now have to do is get out there and enjoy it



Steve

jmorgan

36,010 posts

285 months

Monday 14th April 2003
quotequote all

Well done. Lets have a piccy.

wedg1e

26,807 posts

266 months

Tuesday 15th April 2003
quotequote all
Woohoo! Nice one... it'll all be worthwhile, trust me: I know people who work with doctors....

Ian